tHe installation
ProCeDUre
installing tHe omni DUo kitCHen taP
Carrying out this operation first will make it easier to plan the
layout inside the cabinet. For safety it is advisable to locate the
tap out of the reach of smaller children.
1. The tap will require a standard 35mm diameter hole drilled in
the kitchen work surface.
important note:
before cutting the
hole make sure that there is sufficient clearance between the
tap handle and the back splash when the handle is in the fully
open position.
2. Insert the flexible hoses and the wire lead through the 35mm
hole.
3. Position the tap for the owners’ convenience. (The tap can
be rotated 180° for left handed operation of the boiling water
function).
4. Working inside the cabinet, slide the gasket (8) and the
clamp plate (5) over the hoses and the stud at the base of
the tap. Screw the clamp nut (6) on to the stud using the box
spanner (7).
5. Check the alignment of the tap then tighten the clamp nut
using the box spanner to firmly secure it on the work surface.
Plan the layout inside the cabinet
• Determine the best positions for the boiler and the filter unit,
making sure that the boiler power cable, the flexible hoses,
and the filter cartridge change indicator cable, are all within
comfortable reach of their respective connection points without
them being compressed, stretched or kinked.
• The boiler must be installed upright with the hose connections at
the top, never on its side.
• Allow a minimum clearance of 80mm at the top of the boiler for
the connecting hoses.
• Choose a location for the filter unit (20) and the stop valve (23)
to allow convenient access for future filter cartridge changes.