5
18
-05.
078
e-GB
.f
m
8. Assembly Instructions
8.1
Push the fitting in the wall niche provided and connect the water supply.
Check the direction of flow.
a:Flow direction
8.2
After tiling, cut the part of both polystyrene half shells sticking out of the wall with a
knife to the height of the front edge of tiles.
☞
Do not cut too deeply into the polystyrene half shells as otherwise you may damage
the fitting.
8.3
Break both polystyrene half shells with your hand.
8.4
Put on the slide on rosette.
9. Function
Triggering water flow
9.1
Press the push-cap.
• Water flows.
• Water flow stops automatically after a set flow duration.
☞
The flow time can be set in the range 1 - 50 s.
10. Adjusting the Flow Duration
10.1
Set the required mixed water temperature.
10.2
Remove the cover platelet.
a: Blade width 3 mm
10.3
Set the flow duration with a screwdriver.
a: Blade width 3 mm
+ longer flow duration (max. 50 s)
– shorter flow duration (min. 1 s)
10.4
Trigger the valve to measure the flow duration.
10.5
Put on the cover plate after setting the required flow time.
11. Replacing the Functional Part
11.1
Turn off the water supply.
11.2
Trigger the valve.
11.3
Remove the cover platelet.
a: Blade width 3 mm
11.4
Remove the circlip.
Содержание 2195 00 23
Страница 19: ...19 18 05 078e PL fm Notizen ...