8
ZMI
_001_
2000
101
120
-AQ
U
A
107
_#SE
N
_#AQ
U
_#V3
.f
m
11.3
Latch the cable cores (d) into the cable core guides (e) according to their colours.
11.4
Cut off the protruding ends of the cable core so that they are flush, i.e. so that they
do not protrude.
11.5
Place the union nut (c) on the electronic T-junction (f) and tighten with the required
torque (1.2 Nm).
Caution!
Ensure correct polarity.
Each core cable colour must be in the same cable core guide on both union nuts.
☞
When the union nut is being tightened, the electrical contact and the pull-relief are
automatically established.
Special seals provide protection against dust and water.
12. Mounting the Complete Installation Kit
Warning!
• Operate the product only with safety extra low voltage (SELV). Do not earth the
components.
• The power supply (not included in the scope of delivery, see accessories,
) must be set up outside of the wet area, in a separate room.
• Secure the electric connection with an earth leakage circuit breaker (RCD).
Failure to observe can mean risk of death or material damage, e.g. from electric
shock or fire.
☞
The system line (not included in scope of delivery) for connecting the power supply
to the fittings must be installed in a conduit (to be supplied by customer) and looped
through.
12.1
Remove the shell protector.
12.2
Close the water volume regulator with a hollow hexagon wrench.
a: closed
b: open
12.3
Unscrew the locking screw (c) on the flow volume regulator.
12.4
Replace the filter (d).
☞
Important!
Ensure that the filter is positioned the right way round.
12.5
Screw-in the locking screw (c) on the flow volume regulator.
Caution!
While turning the union nuts (f), use an open-end spanner to hold the water volume
regulators (e) in place.
12.6
Remove the flush connector (g) and the existing seals.
12.7
Mount the solenoid valve (h) using new seals and the tube (i).