5.5. Electrical connection (on site)
Note:
The input power box and the main disconnector switch must be
provided
and
installed
by
the contractor. The manufacturer is not responsible for providing those equipments but may
nevertheless give advice in their selection. If needed, please contact your FRACO representative.
The power box provided by the contractor must be equipped with a disconnection switch and
fuses installed according to the provided instructions.
Main power
input
Power cable of the
machine
On site power
cable
WARNING !
The motors, brakes and other electrical
components may be equipped with a
permanent heating system. These
heating systems are necessary when
the platform is use at temperatures of
5°C (41°F) and below
. Keep the power
boxes (
principal, GC1
) and main control
panel (
CC1
) energized at all times.
Use at temperatures of
MINIMUM
-20°C
(-4°F).
ATTENTION!
NEVER TURN OFF
the
power box disconnectors if using heating
systems. Also valid for the main supply
input.
Main power
switch