15
U35 FPI Direct Vent Gas Insert
THE KENSINGTON FRONT INSTALLATION
3-Panel Door Installation:
2-Panel Door Installation:
Sub-Frame
1)
Install the Sub-Frame by hooking the top
fl
ange onto the top of the
Glass Door and swing the Sub-Frame towards the unit. Pull out the
hooks which already secure the Glass Door and place them thru the
holes in the bottom of the Sub-Frame to secure both the Glass Door
and Sub-Frame in place together.
Glass Door
Hook
Sub-Frame
2)
Mount the 2-panel Door Frame to the
fl
ange on Sub-Frame, ensuring
to line up holes. Secure using the 6 screws provided.
3)
Hook the Left Side Screen Door to the Door Frame by placing the
door hinges (top & bottom) over the pins on the Door Frame. Repeat
for Right Side Screen Door.
Note:
It will be easier to put the Screen Door in place by starting with
the bottom hinge.
Left Side Door
Pin on Door Frame
Note:
If you
fi
nd that the Left or Right Side Screen Door is lower then
the other, use the spacer provided to help align the Doors.
The spacer is to be placed over the bottom pin before installing the
Screen Door.
Sub-Frame
1)
Install the Sub-Frame by hooking the top
fl
ange onto the top of the
Glass Door and swing the Sub-Frame towards the unit. Pull out the
hooks which already secure the Glass Door and place them thru the
holes in the bottom of the Sub-Frame to secure both the Glass Door
and Sub-Frame in place together.
Glass Door
Hook
Sub-Frame
2)
Mount the 3-panel Screen Door / Frame Assembly to the
fl
ange on
Sub-Frame, ensuring to line-up holes. Secure using the 4 screws
provided.
INSTALLATION