OWNER’S MANUAL /
HÉLIA 44
OWNER’S MANUAL /
HÉLIA 44
19
18
MOORING AND TOWING
Start the starboard engine.
Raise the anchor to the bridle snap hook
and undo the snap hook from the
bridle.
When raising,
check that the chain enters the well properly
in order to avoid
the chain blocking.
Raise the anchorage slowly,
checking that the anchor is placed correctly in its
davit.
When the anchor is close to the davit,
check that the tip moves into the roller
in the right direction.
Block the chain by pulling hard on the security hoist:
this will jam the anchor
on the davit and prevent it to damage davit or hulls.
Clamp the hoist to avoid
the anchor moving on the davit.
1
2
3
4
5
6
7
Raising the anchor
During the operation, stay away from the windlass and the chain and
make sure that you protect your hands and feet.
Keep an eye whilst rising the chain in order to not damage the hull.
WARNING
For mooring, the anchor points are the 6 cleats (a) :
- 2 x front
- 2 x middle
- 2 x aft
a
V
Mooring cleats
The cleats have a resistance of around 6000kg. They are designed for a Ø18 polya-
mide rope.
For towing, use the 2 front cleats to attach a Ø18 polyamide rope like a snap rope.
ANCHORAGE (NEXT)
Sailing
2
If the force required by the windlass is too important, the breaker is
triggered. Reset it to restart the windlass (accessible in the starboard
engine compartment).
WARNING
a
a
a
a
a
a
Содержание Helia 44 2019
Страница 1: ...H LIA 44 OWNER S MANUAL...
Страница 11: ...V Deck 22 24 V Hull saloon 25 29 3 Equipments H LIA 44...
Страница 16: ...V Steering system 32 V Electricity 33 35 V Gas circuit 36 V Water 37 45 Systems 4 H LIA 44...
Страница 24: ...Manoverboard prevention and man recovery 5 H LIA 44...
Страница 26: ...Fire protection 6 H LIA 44...
Страница 30: ...Maintenance V Drainage 60 V Running rigging sheets and ropes 61 V Periodic maintenance chart 62 64 8 H LIA 44...