background image

LIGHT COLUMN BOLLARD

SURFACE MOUNT WITH J-BOLTS INSTALLATION INSTRUCTIONS

page 1 of 3  |  Rev. 08-01-14

© 2016 Forms+Surfaces®  |  All dimensions are nominal. Specifications and pricing subject to change without notice. For the most current version of this document, please refer to our website at www.forms-surfaces.com.

T 800.451.0410  |  www.forms-surfaces.com

TOOLS NEEDED

MATERIALS INCLUDED

STEP BY STEP

Pour concrete footer

• Mix and pour concrete footer according 
   to concrete manufacturer’s instructions. 
• A sufficient footer size depends on frost 
   and other conditions to be determined by 
   the installer. 
• A minimum of a 12" diameter x 20" 
   deep footer is recommended for Series 
   500 bollards; minimum of a 13" 
   diameter x 20" deep footer is 
   recommended for Series 600 bollards.

Insert J-bolt anchors

• Insert 1/2"-13 x 18" galvanized steel 
   J-bolt anchors (a) into concrete.
• Use template (included) to position J-bolt 
   anchors in proper locations. Tops of 
   J-bolt anchors must be a minimum of 
   1-1/4" above concrete surface.
• Allow concrete to set completely, in
   accordance with concrete 
   manufacturer’s instructions, before 
   moving to step 3.

Slide bollard onto J-bolt anchors

• Slide bollard base plate over J-bolt 
   anchors and lower bollard to concrete 
   level.
• Carefully use masking tape to tape 
   escutcheon cover further up the body 
   until installation is complete.

  

FOR ALL STANDARD LIGHT COLUMN BOLLARDS

a

socket wrench

3/4

"

 socket

c

b

a

template

(upon request)

silicone RTV sealant 

(optional)

masking tape

strap 

wrench

a

DIAMETER

DEPTH

1-1/4"
MINIMUM

Отзывы: