Shiplap Pent Shed
6' x 4'
Important :
Assembly of this
shed requires a
minimum of two
adults.
Issue 0215
B
SDP6BK
BACK PANEL
SDP4RHS
RIGHT SIDE
179112808
ROOF SHEET
D
E
F
A
SDP64 PARTS LIST
BRDFL46
FLOOR
SDRDT
DOOR
SDP6FR
FRONT PANEL
40121830PARDTR
1830mm CORNER STRIP QTY 2
G
Place the corner strips so that they cover the joins between
the panels. Fix each in place using 3 x 30mm screws
2
4
1
1
C
SDP4LHS
LEFT SIDE
3
REQUIRED TOOLS :
(NOT SUPPLIED)
TAPE MEASURE
HAMMER
PCWIN1
WINDOW QTY 1
H
Top View
B
D
A
Must Pre drill for
each screw used.
FELT QTY 1
85008
Fixing Pack (SDP64FP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Flush Hinge
Qty 2
50mm Screw Qty 22
30mm Nail Qty 42
25mm Screw Qty 19
Hasp & Staple
30mm Screw Qty 25
10mm Felt tacks
Qty 80
SHARP KNIFE
A
C
Z’ bracket Qty 2
40121717PARDTR
1717mm CORNER STRIP QTY 2
37281791
1791mm BATTEN QTY 2
59121280PDT
1280mm BARGE BOARD QTY 2
37281699
1699mm BATTEN QTY 1
25120675PDT
675mm STRIP QTY 1
84996
675mm PLASTIC STRIP QTY 3
F
I
J
K
L
M
N
P
B
C
D
A
J
O
59121815PDT
1815mm BARGE BOARD QTY 1
25mm Security Screws
Screws Qty 8
FLAT HEAD
SCREWDRIVER
POZI DRIVE
SCREWDRIVER
SCISSORS
Place the hinge against the inside of the door frame
and position the large section of the hinge so that it is
flush with the inside of the framing, as shown. Fix
with 25mm screws.
Open the hinge and fix the smaller section to the
door framing. Again make sure that the hinge is flush
and that the holes are positioned so that the 25mm
screws locate correctly into the batten.
Q
20121710PDT
20x1710mm STRIP QTY 1
I
Position the staple on the door end in line with the centre batten on the reverse of the door.
Make sure that the staple is in line with the framing behind. Fix in place using 2 x 25mm
screws.
Before fixing the Hasp to the door make sure that it is in line with the framing on the reverse of
the door and that it closes over the Staple. Fix this in place using 3 x 25mm screws.
Place the panels on top of the floor. Make sure that all the panels are tight and flush
before fixing them to each other using 3x50mm screws.
Before fixing each panel to the floor make sure that the panels are sitting flush and fix
them in place using 50mm screws. position each screw so that it locates into the bearers
underneath.
3x50mm screws for the front and back panels.
2x50mm screws for the side panels.
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pre-treated with a factory base coat for
protection during storage and transit. We recommend that
you treat your new building as soon as possible after
assembly using a wood preservative treatment. Apply in
accordance with the manufacturers instructions.
- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
Technical Helpline:
0333 7777 089
8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in any way (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Staple
Hasp
Fix the 20 x 1710mm strips to the side of the
door frame so that it is tight with the cladding
and flush with the frame. Use 3 x 30mm
screws for each.
Q
A