Making British gardens great
WORKSHOP BASE
INSTRUCTIONS
ISSUE: 0219
FIXING PACK CODE:
WBPMFP
Tape
Measure
We recommend using the following tools (
NOT SUPPLIED
):
Pozidrive
Screwdriver
Drill & 2mm
Drill Bit
Spirit Level
Start at the corners.
Pre-drill and
screw through the face of the one
timber part into the end of the
other.
Use the section layouts below
for guidance on positioning.
Repeat this process for the
opposite corners
to form the overall
outer frame. Ensure that all edges
and faces of the timber parts are
flush.
Measure where the central timber
part(s) will be placed. Use the
measurements from the section
layout below for your chosen shed
base.
Mark, pre-drill and screw
them into place.
1
2
3
Missing Something?
Call our aftersales team on
0333 777 7089
Need more information?
Call our technical team on
0333 321 3142
Visit our website for spare
instructions and more
information
www.forestgarden.co.uk
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
5 x
90mm
Scr
ews
QTY
: 160
FIXING PACK CONTAINS:
SECTION LAYOUTS
Identify your chosen shed base to follow the correct construction and
measurements provided:
INSTRUCTIONS
PLEASE KEEP PLASTIC BAGS AND
SMALL PARTS AWAY FROM CHILDREN
REMINDER
Always pre-drill
before screwing.
It’s vital that you build your new shed base on
level ground in your
desired location.
Indicates the timber orientation during
construction. This will apply to all of
the corners for your base.
4
Repeat the first 3 steps for each base you
need to construct. Once all individual
bases are constructed,
line up the bases
in the correct orientation.
Ensure they
are flush. Use the section layouts below
for guidance on positioning.
317mm
10’
10’
317mm
15’
10’
317mm
20’
10’
397.75mm
10’
6’
347.83mm
10’
8’
347.83mm
12’
8’
SBP1010M
SBP108M
SBP106M
SBP128M
SBP1510M
SBP2010M