background image

Making British gardens great

WORKSHOP BASE 

INSTRUCTIONS 

ISSUE: 0219

FIXING PACK CODE: 

WBPMFP

 

Tape 

Measure

We recommend using the following tools (

NOT SUPPLIED

):

Pozidrive 

Screwdriver

Drill & 2mm 

Drill Bit

Spirit Level

Start at the corners. 

Pre-drill and 

screw through the face of the one 

timber part into the end of the 

other.

 Use the section layouts below 

for guidance on positioning.

Repeat this process for the 

opposite corners

 to form the overall 

outer frame. Ensure that all edges 

and faces of the timber parts are 

flush.

Measure where the central timber 

part(s) will be placed. Use the 

measurements from the section 

layout below for your chosen shed 

base. 

Mark, pre-drill and screw 

them into place.

1

2

3

Missing Something?

Call our aftersales team on

0333 777 7089

Need more information?

Call our technical team on

0333 321 3142

Visit our website for spare 
instructions and more 
information

www.forestgarden.co.uk

Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

5 x 

90mm

 Scr

ews

QTY

: 160

FIXING PACK CONTAINS:

SECTION LAYOUTS 

Identify your chosen shed base to follow the correct construction and 

measurements provided:

INSTRUCTIONS 

PLEASE KEEP PLASTIC BAGS AND 

SMALL PARTS AWAY FROM CHILDREN

REMINDER

Always  pre-drill       

before screwing.

It’s vital that you build your new shed base on 

level ground in your 

desired location.

Indicates the timber orientation during 
construction. This will apply to all of 
the corners for your base.

4

Repeat the first 3 steps for each base you 

need to construct. Once all individual 

bases are constructed, 

line up the bases 

in the correct orientation.

 Ensure they 

are flush. Use the section layouts below 

for guidance on positioning.

317mm

10’

10’

317mm

15’

10’

317mm

20’

10’

397.75mm

10’

6’

347.83mm

10’

8’

347.83mm

12’

8’

SBP1010M

SBP108M

SBP106M

SBP128M

SBP1510M

SBP2010M

Отзывы: