background image

Overlap Apex Shed

6' x 4' 

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

Issue 0216

B

ODA4PE

PLAIN END 

17917658

ROOF SHEET

QTY 2

D

E

A

ODA46NW PARTS LIST

SFL46

FLOOR

SDRDT

DOOR 

ODA4DE

DOOR END 

44161570DT

1570mm C/STRIP QTY 4

H

 K

H

45281753

1753mm BATTEN QTY 1

F

Place the corner strips so that they cover the joins 
between the panels. Fix each in place using 3 x 30mm 
screws

2

1

1

C

ODA6PS

PLAIN SIDE  QTY 2

3

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE 

SCREWDRIVER

SPIRIT LEVEL

TAPE MEASURE

HAMMER

51120810PAII58DT

810mm BARGE BOARD QTY 4

 I

Top View

C

B

C

Must Pre-drill for 
each screw used.

37281791

1791mm BATTEN QTY 2

 J

FELT

FELT4BLROSE 

QTY 1

G

FIN20010512DTR

FINIAL
 QTY 1

20121695PDT

20 x1695mm STRIP QTY 1

L

SHARP KNIFE

Fix the 20 x 1695mm strip to the side 
of the door frame so that it is tight 
with the cladding and flush with the 
frame. Use 3 x 30mm screws.

 

Place the panels on top of the floor. Make sure that all the panels are tight and flush before 
fixing them to each other using 3x50mm screws.

Make sure that the panels are sitting flush before fixing to the floor using 50mm screws making 
sure that all of the screws are positioned so that they screw into the bearers underneath.

3x50mm screws for the sides.
2x50mm screws for the plain and door ends.

Place the 1753mm batten so that it connects the door end and plain 
end. Fix this in position using a 50mm screw for each end as shown.

4

 H

 

 

J

 J

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pre-treated with a factory base coat for 
protection during storage and transit. We recommend that 
you treat your new building as soon as possible after 
assembly using a wood preservative treatment. Apply in 
accordance with the manufacturers instructions.

- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to. 
If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

Fixing Pack (OPA46FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

Flush Hinge 

Qty 2

50mm Screw Qty 24

30mm Nail Qty 45

25mm Screw Qty 17

Hasp & 

Staple

30mm Screw Qty 19

10mm Felt tacks

 Qty 100

40mm Screw Qty 12

25mm Security Screws

Screws Qty 7

A

A

D

A

L

 

E

Place the hinge against the inside of the door frame and 
position the large section of the hinge so that it is flush 
with the inside of the framing as shown. Fix with 25mm 
screws.

Open the hinge and fix the smaller section to the door 
framing. Again make sure that the hinge is flush and that 
the holes are positioned so that the 25mm screws locate 
correctly into the batten.

 

a

b

Отзывы: