background image

6' x 8' Overlap Apex Shed 

Important : 

Assembly of this 

shed requires a 

minimum of two 

adults.

MUST PRE-DRILL

FELT 

B

EOL68PE

PLAIN END 

EOL68WS

WINDOW PANEL 

EOLPP2275

PLAIN PANEL 

236510708

ROOF BOARD

 QTY 2 

FELT78BL

 QTY 1

C

D

E

G

 I

F

44161490DT

1490mm Corner STRIP QTY 4

9090012FINDTR

FINIAL
 QTY 2

L

A

ODA68 PARTS LIST

1

SFL46 

FLOOR QTY 2

SDRDT

DOOR  

ODA6DE

DOOR END 

40081085DTR

1085mm BARGE BOARD QTY 4

H

K

M

N

H

J

4

28120650DTR

650mm STRIP QTY 1

28121183PDT

1183mm BATTEN QTY 4

45282331PAR

2331mm BATTEN QTY 1

 

 

 

 

A

B

C

2

50mm screw

 

 

L

L ‘ bracket

50mm screw

PCWIN1

WINDOW QTY 2

The windows are packed 

together tightly, separate 

before assembly.

O

20121695PDT

1695mm STRIP QTY 1

Turn the floor sections upside down and secure them to each other screwing through the 
bearers using 2 x 50mm screws.

Turn the floor back over once its completed.

Place the panels on top of 
the floor. Make sure that all 
the panels are tight and flush 
before fixing them to each 
other using 3x50mm screws.

When the panels are secured 
to each other, make sure that 
they are square before 
securing them to the floor. 

Secure the door end and the 
plain side to the floor using 3 
x 50mm screws ensuring the 
screws are in line with the 
bearers underneath.

Fix the window side and plain 
end to the floor using L’ 
brackets and  25mms 
screws. 

 

(when position the brackets 

make sure these are in line 
with the floor bearers 
underneath.)

3

Place the hinge against the inside of the door frame and position the 
large section of the hinge so that it is flush with the inside of the 
framing as shown. Fix with 25mm screws.

Open the hinge and fix the smaller section to the door framing. Again 
make sure that the hinge is flush and that the holes are positioned so 
that the 25mm screws locate correctly into the batten.

 

Place the 2331mm batten so that it sits at the apex and bridges 
between the plain end and door end. 
Fix the batten in place using an L’ bracket and 4 x 25mm screws 
for each end.

Position each corner strip so that it is flush with the panel and 
covers the joins. Fix each in place using 4 x 30mm nails.

5

Fixing Pack (ODA68FP)

This fixing pack is used for several products. 
There may be additional fixings.

Not to Scale

30mm Screw Qty 2

50mm Screw Qty 22

25mm Screw Qty 53

10mm Felt tacks Qty 100

20mm Nail Qty 16

Flush Hinge 

Qty 2

Hasp & 

Staple

25mm Security Screws

Screws Qty 12

REQUIRED TOOLS : 
(NOT SUPPLIED)

POZI DRIVE 

SCREWDRIVER

TAPE MEASURE

HAMMER

SHARP KNIFE

FLAT HEAD 

SCREWDRIVER

SCISSORS

30mm Nail Qty 40

L’ bracket

Qty 6

IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ 

CAREFULLY

This building is pre-treated with a factory base coat for 
protection during storage and transit. We recommend that 
you treat your new building as soon as possible after 
assembly using a wood preservative treatment. Apply in 
accordance with the manufacturers instructions.

- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Timber is a natural material. It will shrink and swell as a 
result of varying moisture content.
- Due to the nature of the material the doors may need some 
trimming for a neater fit.
- Please keep all plastic bags and small parts away from 
children

Technical Helpline:

 0333 7777 089

  8.30 am and 5.00 

pm  Monday to Friday.

Please check all parts prior to assembly

Assembly of damaged parts may be deemed to be 
acceptance and this may affect the remedies you are entitled 
to. 
If the product is not constructed in accordance with the 
instructions, or is altered in any way (e.g. painted), the 
manufacturer cannot be held liable for any resulting damage.

A

D

A

A

A

D

A

F

K

N

Fix the 20 x 1695mm strip to the side of the door frame so 
that it is tight with the cladding and flush with the frame. Use 
4 x 30mm nails.

A

 

A

D

A

D

Отзывы: