Krystal Enterprises
66
Size of Steel Tubing used in Body Sidewall & Roof Structure
1” x 1”
Center line Spacing of Tubing used in Body Sidewall & Roof Structure
32”
Gauge of Steel Tubing used in Body Sidewall & Roof Structure
16
Aluminum Sidewall Material
.063
One Piece Aluminum Roofi ng Material
.040
Size of Steel Tubing used in Main Floor Structure
2” x 4”
Center line Spacing of Tubing used in Floor Structure
32” max.
Gauge of Steel Tubing used in Floor Structure
12
Thickness of Double Backed Insulated Fiberglass Batting Insulation
2”
Window Size
32 x 40”
General Body Materials and Construction Measurements
Содержание Econline Super Duty Chassis 450 1998 Series
Страница 2: ...ProCarManuals com ...
Страница 39: ...Krystal Enterprises 39 THIS PAGE IS INTENTIONALLY BLANK ProCarManuals com RETURN TO MENU ...
Страница 89: ...Krystal Enterprises 89 89 Troubleshooting Notes PROBLEM POSSIBLE SOLUTIONS ProCarManuals com RETURN TO MENU ...
Страница 95: ...Krystal Enterprises 95 95 THIS PAGE IS INTENTIONALLY BLANK ProCarManuals com RETURN TO MENU ...
Страница 107: ...Krystal Enterprises 107 107 F 550 Shuttle Bus Wiring Diagram ProCarManuals com RETURN TO MENU ...