Install the S4810
Figure 6
3 S4810s connected in a ring
Supply power and power up the system
Supply power to the S4810 after the chassis is mounted in a rack or cabinet.
Force10 Networks recommends re-inspecting your system prior to powering up. Verify that:
•
the equipment is properly secured to the rack and properly grounded.
•
the equipment rack is properly mounted and grounded.
•
the ambient temperature around the unit (which may be higher than the room temperature) is within
the limits specified for the S4810.
•
there is sufficient airflow around the unit.
•
the input circuits are correctly sized for the loads and that sufficient over-current protection devices are
used.
•
all protective covers are in place.
•
blank panels are installed if Optional Modules are not installed.
Note:
A US AC power cable is included in the shipping container for powering up an AC power supply. All
other power cables must be ordered separately
Attention:
Electrostatic discharge (ESD) damage can occur if components are mishandled. Always wear
an ESD-preventive wrist or heel ground strap when handling the S4810 and its components.
52
60
52
60
52
60
48
56
48
56
48
56
Chassis 3
Chassis 2
Chassis 1
Содержание S4810P
Страница 1: ...Installing the S4810P System 101 00382 02 June 16 2011...
Страница 5: ...Installing the S4810 System 5 Requesting a hardware replacement 49...
Страница 6: ...6 Table of Contents...
Страница 18: ...18 Site Preparations...
Страница 32: ...32 Power Supplies...
Страница 46: ...46 S4810 Specifications...