Installation
4.1
Safety instructions for Mounting and Installation
IMPORTANT!
Never install or apply damaged products. Claims concerning damages must be made to the carrier
immediately.
IMPORTANT!
Work in the connection with installations, start up, and maintenance on the FOAMICO cleaning systems
should only be done by authorized electricians, because the valid national regulations concerning prevention
of working accidents. (etc. high voltage regulations: EN 60204, VBG4 DIN-VDE 0100/0113/0160) must be
respected. In cases of irregular installations there is a risk for major damages on both material and people.
4.2
Location and Mounting
The system should always be located in a frost-free room. Stationary system must always be mounted where
the surfaces are of solid quality, and when applicable the fastening must always be done with the delivered
bolts and raw plugs. Holes for wall brackets must be drilled according the dimensional drawing.
The Main station should be connected to an adequate pipe system. This should correspond to distance from
the water supply, the maximum water flow and vertical distance from the boosting System.
4.3
Water supply
ATTENTION! Connection to water supply should always be done in according to local or national
standards.
If the legislation in your country requests safeguards for reverse flow, this must be provide for.
WARNING
Due to the nature of low pressure cleaning systems Pressure surges can occur. The installer is responsible for
dimensioning the supply line to be able to adapt Pressure surge.
BEFORE mounting the system, the piping must be flushed with water in order to remove possible parts or
dirt.
ATTENTION. At the supply pipe to the main station a valve and filter must be installed. We recommend
using Original FOAMICO installations set. The water should be connected to the inlet shown in
POS A
. fig.
5.1
ATTENTION! The pump must be filled with water and vented. This must be done with the electricity cut
off. If the pump runs dry it may be damaged.
4.3.1 Venting:
1. Connect the hose to the coupling
POS. E
. figure 5.1 make sure the valve is closed.
2. Make sure the low-pressure valve/ gun at the end of the hose is closed
3. Open the ball valve
POS E
fig.5.
4. set the handle
POS. D
fig. 5.1 in rinse position
3. The system is now ready for venting. Vent the system by open the low pressure valve / gun, until all air is
out of the pipe system (approx. 3-5 min)
The Main station is now ready.
Содержание 7001412
Страница 7: ...7 MSC 0106_NEXT_7001412 17_UK 22 08 2019 3 3 Model Overview Type 1 MS C 0106 1 Type 2 MS C 0106 2...
Страница 12: ...12 MSC 0106_NEXT_7001412 17_UK 22 08 2019 MS ULTRA NEXT 0106 2 XA...
Страница 13: ...13 MSC 0106_NEXT_7001412 17_UK 22 08 2019 MS ULTRA NEXT 0106...
Страница 27: ...27 MSC 0106_NEXT_7001412 17_UK 22 08 2019 8 Electrical diagram 8 1 Electrical diagram MS 0106 and MS 0106 EX...
Страница 28: ...28 MSC 0106_NEXT_7001412 17_UK 22 08 2019 8 1 1 Electrical diagram 240V AC 8 1 2 Electrical diagram 24 DC...
Страница 30: ...30 MSC 0106_NEXT_7001412 17_UK 22 08 2019 8 2 1 Electrical diagram 240V AC 8 2 2 Electrical diagram 24 V DC...