CHANGING THE V-BELT
5G Paint Mixer Instruction Manual
37
CHANGING THE
V-BELT
Read all of the following instructions. If you have any doubt about
performing these procedures, please contact Customer Service at Fluid
Management.
Refer to the Parts Section for component identification and location.
1. Unplug the electrical cord.
2. Remove all the sheet metal covering as described under “REMOVE
THE EXTERIOR PANELS” on page 30.
3. Loosen the screws and nuts on the flange bearings.
4. Slide the shake frame away from the right side of the crankshaft.
5. Remove the flange bearing on the right side of the machine.
6. Loosen the shake motor mounting screws and slide the motor toward the
crankshaft, thereby loosening the V-belt. Remove the V-belt.
7. Put the new V-belt on the balance groove pulley, then on the motor pul-
ley.
8. Install and tighten down the four (4) motor hold-down screws while
keeping tension on the belt.
9. Be sure to adjust the shake motor for proper tension on the V-belt. The
deflection should be approximately 3/16" at five (5) pounds of pressure.
10. Reassemble the paint mixer by reversing these instructions.
Содержание HARBIL 24018
Страница 4: ...4 Fluid Management...
Страница 28: ...TROUBLE SHOOTING CHART 28 Fluid Management NOTES...
Страница 58: ...REASSEMBLING MIXER 58 Fluid Management NOTES...