Chapter 5: Use Projects
Why Use Projects?
The tester’s ProjX
™
management system lets you set up projects
that help you monitor the status of a job and make sure that your
work agrees with the requirements of the job.
You can use a project to do these tasks:
Specify the tests that are necessary for a job.
Specify settings for tests.
Specify an operator for the job.
Make sets of sequential IDs to use as names for test results.
Automatically save test results with IDs from a set.
Add the results from other necessary tests to each saved result
in the project.
See which IDs do not have results for a specified test.
See what percentage of a job is completed.
See how many links passed and how many failed.
Keep the test results from a job in one place for easy access.
When you use a project, you can do tests and use IDs that are not
specified in the project if necessary. You can also easily change
the settings in a project if necessary.
Note
To manage projects in the cloud, use the
LinkWare Live web application. See Chapter 6.
Содержание CableAnalyzer DSX-602
Страница 60: ...DSX 602 CableAnalyzer Users Manual 52 ...
Страница 74: ...DSX 602 CableAnalyzer Users Manual 66 ...
Страница 100: ...DSX 602 CableAnalyzer Users Manual 92 ...