Initial Installation & Operation 

General 

The filter assembly is packed on a wooden platform with all its parts installed. 

Installation (Figure 3) 

1.

Take the filter assembly out of the wood platform.

2.

Install the filter assembly to the inlet line and outlet line.

3.

Connect a drainpipe to the hydraulic flushing valve outlet opening (at least 80 mm or

3” diameter and no longer then 10m). Confirm that water runs freely out of the

drainpipe.

4.

Position the control panel in such a way as to be protected against humidity

and solar radiation.

5.

Connect the control panel to the power source.

6.

Check that all connections are properly secured.

7.

Check that all bolts and nuts on filter periphery are properly tightened and

secured.

Figure 3: Initial Filter Installation

 

For more information:

WEB: FLTR.com.au   PHONE: (+61) 1300 62 4020   EMAIL: [email protected]   SKYPE: Purple.Engineering

Содержание CSB 10

Страница 1: ...Tekleen CSB USERS MANUAL...

Страница 2: ...ssembly 9 11 Periodic Checks 12 Filter Parts 13 14 Filter Controls 15 20 ALL RIGHTS RESERVED THIS MANUAL AND THE INFORMATION CONTAINED ARE NOT ALLOWED TO BE USED WITHOUT WRITTEN PERMISSION FROM AUTOMA...

Страница 3: ...ic filters Inc for industrial municipal water sewage systems and all types of irrigation applications All products manufactured by Automatic Filters Inc are easy to install use and service and don t r...

Страница 4: ...of 200 4000 micron from different types of fluid sources such as sewage reservoirs rivers lakes and wells The CSB filter contains the following parts 1 Inlet 4 Flushing Valve HYD or Electric 2 Screen...

Страница 5: ...essure indicator or the dwell time between flushing passed The controller transmits a signal for a 10 second flushing cycle The flushing valve 4 opens pressure is released from the inner side of the f...

Страница 6: ...or stainless steel General Technical Data Filter Model M3 h GPM Screen Area Sq ft CSB 4 100 400 5 CSB 6 200 800 5 CSB 8 300 1 200 5 CSB 10 450 1 800 7 CSB 12 650 2 600 11 CSB 14 1 000 4 000 12 5 CSB...

Страница 7: ...Pressure Loss At 200 Micron For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 8: ...least 80 mm or 3 diameter and no longer then 10m Confirm that water runs freely out of the drainpipe 4 Position the control panel in such a way as to be protected against humidity and solar radiation...

Страница 9: ...rform a flushing cycle by pressing the MANUAL FLUSH switches at the control panel 7 Perform continues flushing by disconnecting the high pressure tube from the differential pressure indicator closing...

Страница 10: ...assembly 10 Verify that the straight side of the body seal fits into the groove located in the cover 11 Put the cover into its place on the filter Take care that the motor s axis housing is slide on t...

Страница 11: ...Figure 4 Figure 5 For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 12: ...Figure 6 Brush Removal Installation Figure 7 Fine Screen Assembly Removal Installation For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 13: ...brush according to brush Removal Installation and check the brushes height If defective adjust or replace with a new one 2 Check condition of the bearings replace if damaged or deformed 3 Check exist...

Страница 14: ...For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 15: ...14 Fine Screen Middle Section 15 Fine Screen Upper Section 16 Upper Screen Handle 17 Brush Assembly Axis 18 Brush Unit Tightening Screw 19 Brush Unit 20 U Ring body seal 21 Body Cover 22 2 Connecting...

Страница 16: ...6 TP Sets Differential pressure switch sense time 7 TF Sets the flushing time 8 TD Sets the interval time between flushes C TERMINAL CONNECTIONS TB 1 4 Line supply 380 480Vac GND 3 phase 50 60Hz inlet...

Страница 17: ...ch to ON 1 position and Verify that L1 ON indicator lights b Press pushbutton MANUAL FLUSH momentarily and Verify that L2 FLUSH indicator lights and the motor activated simultaneously Check the motor...

Страница 18: ...f TD timer IF ENABLED BY SET INLETS NOTE That TD can be set in the range of 1 100HR CROUZET MAR1 ON DELAY INDUSTRIAL TIMER REVIEW 1 Operation The MAR1 is a standard on delay industrial timer ranging f...

Страница 19: ...elay of 18 seconds is required a Set the time range knob to 6 60s position b Set the time set knob to 3 3x6 18 seconds 3 State indicator Un signals a No light The timer is in off state No supply on A1...

Страница 20: ...For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 21: ...For more information WEB FLTR com au PHONE 61 1300 62 4020 EMAIL info FLTR com au SKYPE Purple Engineering...

Страница 22: ...f the nature thereof including without limitation injury to persons or property loss of use of the products loss of goodwill loss of profits or any other contingent liabilities of any kind or characte...

Отзывы: