background image

For parts or assistance, call Flotec Customer Service at 

1-800-365-6832

General Information 

3

GENERAL INFORMATION

Tanks listed below are pre-charged, or filled with
air at the factory, to 40 pounds per square inch
(PSI) (276kPa). When installing tank, set tank pres-
sure according to Chart 1. To do this, bleed air from
or add air to tank through valve on top of tank.
NOTICE: Always set or check tank pre-charge with
NO WATER in tank or water pressure in system. If
you have already pumped water before setting or
checking pre-charge pressure, turn pump off. Open
faucet until there is no more water pressure. Set
pre-charge in tank according to Chart 1, then close
faucet and turn pump back on.
NOTICE: Replace and tighten air valve cap after
pressure is adjusted correctly. Failure to replace air
cap may allow loss of air pressure and lead to tank
waterlogging and bladder failure.
CHART I

(The first number on the pressure switch is the
pump on setting; the second number is the pump
off setting.)  
Pre-charged storage tanks can be connected togeth-
er to increase the drawdown. Drawdown is the
actual amount of usable water available from when
the tank is full to when the pump turns on.
Installing two tanks of same size will double the
drawdown supply, three tanks will triple the draw-
down supply, (Figure 1). Locate pressure switch as
shown. Tank and pressure switch cannot be more
than 10’ (3M) apart.

NOTICE: Tank capacity is different than drawdown.
Tank capacity is the actual physical volume of the
sheet metal that makes up the tank. 

OPERATING CYCLE 

(FIGURE 2)

Step 1. Tank nearly empty – air expands filling area

above bladder (Figure A).

Step 2. Water enters tank – air is compressed

above bladder as it fills with water (Figure
B).

Step 3. Pump-up cycle completed – air compressed

to OFF setting of pressure switch (Figure C).

Step 4. Water drawn from tank – compressed tank

air forces water out of bladder (Figure D).

Step 5. Bladder empty – new cycle ready to begin

(Figure A).

Connect discharge pipe from pump to a tee.
Connect one side of tee to tank flange and the
other side of tee to service. Use plastic or steel pipe
as required. To prevent leaks, use Teflon tape or
Plasto-Joint Stik

1

on male threads of all threaded

connections to tank.

STANDARD TANK 

REPLACEMENT

When replacing standard tank in a water system
with pre-charged tank, no bleeder orifices or Air
Volume Control (AVC) are required. When sizing a
pre-charged tank to replace a standard tank, the
tanks should have equivilant drawdowns. For
example, model FP7110T-04 precharged tank has a
drawdown of 5.8 gallons (22L) and is equivalent to
a 42 gallon standard tank that has a drawdown of
4.3 gallons (16.3L).

Hazardous voltage and hazardous

pressure. Disconnect all power to pump and bleed
all pressure from system before working on pump,
tank, or piping.

1

Lake Chemical Co., Chicago, Illinois

When Pressure Switch

Reduce Tank

Setting Is

Precharge (PSI) To

20-40 PSI (138-276 kPa)

18 (124 kPa)

30-50 PSI (207-345 kPa)

28 (193 kPa)

40-60 PSI (276-414 kPa)

38 (262 kPa)

To service

piping

From

Well

Tanks

Pressure switch

909 0993

Figure 1

Figure 2

WATER

A

B

WATER

WATER

C

D

Содержание FP7100H-04

Страница 1: ...04 FP7100H 04 FP7110 04 FP7110T 04 FP7110TH 04 FP7120 04 FP7125 04 FP7130 04 Models FP7125 04 and FP7130 04 do not have the pump mounting bracket Water is Our Business Installation Operation Parts For...

Страница 2: ...eptions to the Twelve 12 Month Warranty Ninety 90 Day Warranty If within ninety 90 days from original consumer purchase any Drill Pump or In Line Water Filter Cartridge shall prove to be defective it...

Страница 3: ...capacity is the actual physical volume of the sheet metal that makes up the tank OPERATING CYCLE FIGURE 2 Step 1 Tank nearly empty air expands filling area above bladder Figure A Step 2 Water enters...

Страница 4: ...e per cycle If this occurs adjust pre charge pressure according to Chart 1 page 3 Flush all air out of piping system and water reser voir portion of pre charged tank Required on new installations pump...

Страница 5: ...functions When replacing standard tank with a pre charge tank run pipe from pump into a tee as shown 2nd leg of tee goes to tank elbow 3rd leg goes to existing service To service Pressure Relief Valve...

Страница 6: ...RTL Model FP7100 04 Model FP7100H 04 Key Part No No Description Used FP7100H 04 FP7100 04 1 Bladder Vinyl 1 U20 7 U20 7 2 Cover Flange 1 U31 442P U31 442P 3 Flanged Nut 5 16 18 Hex 6 U36 202BT U36 20...

Страница 7: ...31 446P U31 446P U31 446P 3 Flanged Nut 5 16 18 Hex 6 U36 202BT U36 202BT U36 202BT 4 Air Valve with Cap 1 U212 160 U212 160 U212 160 Key Part No No Description Used FP7120 04 FP7125 04 FP7130 04 1 Bl...

Отзывы: