21
GB/IE
3. Place a plastic cap (11) onto
each floor bracket (13) and insert
2 screws (16) through each wash-
er (20) (Fig. H).
4. Mount the floor bracket onto the
floor.
5. Mount the second floor bracket
as described in steps 1–4.
Important:
the floor brackets must
be perfectly aligned and have a dis-
tance of exactly 290cm from each
other (measured between the inner
drill holes of both floor brackets).
Installing the posts (Fig. I)
There are 18 adjustment options
for setting the correct length of the
posts.
1. Connect each upper (1)/(2) and
lower post (3) at the appropriate
length.
2. Fasten each upper (1)/(2) and
lower post (3) with 2 screws (17)
and washers (20). Fasten each
screw (17) with a nut (18) and
washer (20). Then place a plastic
cap (19) on each nut.
Installing the awning frame
1. Slot both drive shaft poles (5)/(6)
together (Fig. J).
2. Fasten the drive shaft (5 + 6) with
4 screws (22).
3. Slot both front bars (7)/(8) to-
gether (Fig. J). The locking button
must visibly and audibly click into
place.
4. Run the plastic piping (10)
through the narrower tunnel of the
awning cloth (9).
5. Insert the awning cloth with
plastic piping into the drive shaft
(5 + 6) as shown.
Note:
make sure that the bottom
fold of the tunnel (front bar tunnel)
is always facing upward during
installation.
6. Insert the front bar (7 + 8) into
the front bar tunnel in the awning
cloth (9).
7. Place the end of the roller shaft
(5) on the catch (2a) of the post
(2) (Fig. K).
Note:
the catch (2a) must be com-
pletely inside the roller shaft (5).
8. Remove the pre-mounted nut (6a)
and washer (6b) from the roller
shaft (6).
9. Insert the end of the roller shaft
(6) into the post (1). Use the nut
(6a) and washer (6b) to fasten it
(Fig. K).
Note:
make sure that the bolt
on the roller shaft (6) is properly
aligned.
10. Fasten the roller shaft (5) with
1 screw (22) (Fig. K).
Fastening the awning
frame in the bracket
Important:
assembling the prod-
uct requires at least two people due
to its size.