OPERATING INSTRUCTIONS

FLEXTOOL DOUBLE BEAM SCREED 

FDBS SERIES

Содержание FDBS Series

Страница 1: ...FOR MORE INFORMATION CONTACT US ON 1300 353 986 OR VISIT flextool com au Version 2 0 September 2022 OPERATING INSTRUCTIONS FLEXTOOL DOUBLE BEAM SCREED FDBS SERIES ...

Страница 2: ...on to factory setting by placing a steel ruler against the nut fitted to the threaded end of cable and rotating the nut clockwise until the distance between the nut and end of thread is 40 mm With one nut fitted to threaded end of cable this should achieve a concave lower beam surface of 6 mm This should be checked with a string line and adjusted further if required until a 6 mm deflection is achieve...

Страница 3: ...tion and to supplement the self propelling motion of the screed beams Once the concrete with its surcharge has been spread start the motor and manually pull the beam along the slab Make sure that there is always a continuous surcharge along the entire length of the leading edge and that the ends of the beam ride on the edge forms Generally one steady pass with a double vibrating beam should be eno...

Страница 4: ...ss of hearing ADDITIONAL HAZARDS Slip Trip Fall is a major cause of serious injury or death Beware of excess hose the flexible shaft and water left on the walking or work surface DO NOT allow waste water to accumulate under foot Exercise caution and ensure that the perimeter of elevated formwork or platforms is protected Exercise care when working in the vicinity of unprotected holes or excavation...