ROTARY HEAT EXCHANGER 

EQRB

INSTALLATION AND MAINTENANCE INSTRUCTIONS

IMPORTANT!

During installation

–   Read the instruction manual completely 

before installation and commissioning.

–   The installation must be carried out by 

qualified personnel.

–   General conditions and regulations for 

the installation and operation of electrical 
machinery must be observed.

–   Measures to protect against personal in-jury 

and damage to the machine must be taken 
following local rules and regulations

–   The EMX-R drive system is intended for 

permanent installation.

–   Cables must not be connected or 

disconnected while the supply voltage is on. 

–   Check that the equipment is correctly 

connected before it is taken into use. 
See the instructions for mounting/
connection.

–   Faults that arise due to faulty installation or 

operation are not covered by the guarantee. 

During operation

–    Measurement in the control unit during 

operation may only take place at the 
connection terminalblocks. 
N.B.! Great care must be taken.

–   The units may not be opened or 

disassembled while they are operating. 

Regarding the control logic and operation: 

During start up and after each time the AHU 
has been stopped, it is recommended that the 
exhaust fan operates during 1 minute before the 
supply fan is started.

SAFETY INSTRUCTIONS

INSTALLATIONS INSTRUCTION, DRIVE SYSTEM 

EMX-R, EQRB SIZE 020-090