FläktGroup EQAZ-04 Скачать руководство пользователя страница 2

Installation  instruction  

FläktGroup 

DC_8658GB   20181214_R0

We reserve the right to make changes without prior notice

2

SAFETY DIRECTIVES

USING THE AIR HANDLING UNIT

CAUTION!

 

Before the air handling unit is taken into opera-
tion, all unprotected openings must be equipped 
with protective screens.

The air handling unit must not be taken into 
operation before all electrical and mechanical 
safety devices have been installed.

Take great care when opening the air purging connections 
for the hot water supplied to the air heater. Bear in mind 
the risk of water hammer or steam discharge.

Whenever service work or inspection is to be carried out, 
all safety isolating switches of the unit should be tripped 
1 minute before the inspection doors are opened. Before 
restarting, all safety devices must be restored.

If the eQ air handling unit is disassembled prior to installa-
tion, FläktGroup declines any responsibility for conforman-
ce of the unit to its rated tightness class.

The air handling unit covers are equipped with lockable 
handles. Be sure that you always leave the unit with 
the covers locked and keep the keys inaccessible to 
unauthorized persons.

Follow seperate instruction for replacement of compo-
nents.

There should be a service aisle in front of the electrical 
cabinet, this is to be arranged so that the cabinet can be 
serviced safely in accordance with local electrical safety 
regulations. 

Planning for work of this type is a condition that must be 
complied with in order for the air handling unit to be CE 
marked. Local provisions and regulations shall be obser-
ved.

Read and understand these instructions before you begin 
installing the air handling unit. The owner or the fitter of 
the air handling unit is responsible for seeing to it that 
the safety regulations in force are followed.

No unauthorized person shall be allowed to work with 
the air handling unit. Only qualified personnel.

FREE SPACE FOR SERVICE AND REPAIR WORK

The space around the air handling unit shall be planned for routine 
service work such as filter replacement and cleaning fans and 
fan casings. Consideration must also be given to future replace-
ment of components such as filter, heat exchangers, air heaters, 
air coolers, control box and fans.
 
Unit viewed from above

A

A

C

A = width for replacing components

C = width for replacing filter

 Size 

C

 005  800  600
 008  1100  800
 009  800  600
 
 011  1200  500
 014  1100  600
 018  1400  600
 
 020  1100  600
 023  1700  600
 027  1400  600
 
 032  1800  400
 036  1400  600
 041  2000  600

 Size 

C

 045  1700  600
 050  2300  500
 054  2000  600
 
 056  1700  600
 063  2300  600
 068  2000  600 

 072  2600  600
 079  2300  600
 090  2600  600

Содержание EQAZ-04

Страница 1: ...ion unit sizes 009 090 8 Jointing of air handling unit blocks 9 Suspended mounting from the ceiling 12 Heavy duty installation 12 Suspended installation hygienic version unit sizes 005 090 13 Unit sta...

Страница 2: ...d be a service aisle in front of the electrical cabinet this is to be arranged so that the cabinet can be serviced safely in accordance with local electrical safety regulations Planning for work of th...

Страница 3: ...st 5 times the mass of the vibrationisolated object i e the air hand ling unit above and supported on anti vibration mountings If the floor has a light structure its mass and rigidity can be improved...

Страница 4: ...rgerandheavierunitscanberaisedbyusingahand operated form loader on both short sides to avoid damage to the under side of the unit Lifting by means of a forklift truck with extended forks to avoid dama...

Страница 5: ...000 kg Note Lift tubes are only suited for air handling units supplied from Fl ktGroup The lift tubes must only be used for the specific unit that they have been ordered to The lift tubes are adapted...

Страница 6: ...nuts through the angle bracket beam and cross beam to 28 Nm 2 1 150 EUAZ 2 Casing ASSEMBLY OF THE EQAZ 04 IN SEPARATELY DELIVERED VERSION The base frame can be supplied either in assembled or unassemb...

Страница 7: ...n functional components with a drainage facility Lateral and longitudinal position adjustment is most easily performed with a roller crowbar or similar MOUNTING ON THE FOUNDATION OUTDOOR VERSION UNIT...

Страница 8: ...14_R0 Wereservetherighttomakechangeswithoutpriornotice 8 JOINTING OF AIR HANDLING UNIT BLOCKS GENERAL INSTRUCTIONS 20 x 10 mm 15 x 5 mm 1 2 EQGA EQGB 15 3 5 A 1 3 5 B 1 2 1 1 1 1 A 2 1 2 1 B NOTE Inst...

Страница 9: ...n Fl ktGroup DC_8658GB 20181214_R0 Wereservetherighttomakechangeswithoutpriornotice 9 GENERAL INSTRUCTIONS EQGA EQGB 20 x 10 mm 15 x 5 mm 1 2 2 2 2 1 2 2 2 1 C C EQHA EQHB EQGA EQHB EQGB 2 1 2 1 2 1 2...

Страница 10: ...nally NOTE If the unit is ordered with lifting devices they are mounted in the factory After usage they should be removed and discarded The docking devices should be mounted at the same location using...

Страница 11: ...Group DC_8658GB 20181214_R0 Wereservetherighttomakechangeswithoutpriornotice 11 GENERAL INSTRUCTIONS 3 2 4 1 1 Rear side Tip In cases were accesability is limited on the rear side of the unit A thread...

Страница 12: ...or sizes 036 090 Example 1 Retaining flange A max 35 mm along the inspection side unite sizes 005 090 Cut and remove the edge A at the hinge locations to unite sizes 005 090 Retaining flange A max 75...

Страница 13: ...d the stand from hangers Larger units must be equipped with EQAZ 29 flour grating to enable service personel to enter The frame must also be executed so that so that the base panels have either transv...

Страница 14: ...ngth of lower unit and fit a bar for height compensation under the front frame sectiion Fit EQAZ 16 01 1 sealing strip around the opening of the empty section before fitting the upper unit The EQAZ 16...

Страница 15: ...9 SINGLE DECK CASING 005 008 DOUBLE DECK CASING The following supporting surface is required for a vertical arrangement Flat floor or frame made of angle steel for example 50 x 50 x 5 with outer dimen...

Страница 16: ...lded edges of the roof sections meet and secure it by applying light hammer blows to snap it on PG slip clamp to be fitted over the joints between the units supplied PG slip clamp factory mounted Roof...

Страница 17: ...akechangeswithoutpriornotice 17 GENERAL INSTRUCTIONS TO DISMANTLE THE HANDLES WITH WITHOUT LOCK LOCK WITHOUT HANDLE TO ADJUST THE HINGES Back off the screws and shift the hinge in the appropriate dire...

Страница 18: ...s only and provided that the air handling unit has not been disas sembled The order should also state the product code The code can be found on a separate data panel located on the functional compo ne...

Отзывы: