Installation instruction
FläktGroup
DC_8658GB 20181214_R0
We reserve the right to make changes without prior notice
12
GENERAL INSTRUCTIONS
SUSPENDED MOUNTING FROM THE CEILING
Place the unit on a frame constructed on-site. See the Examples
below. Suspend the frame from pendant hangers.
Larger units must be equipped with EQAZ-29 flour grating to
enable service personel to enter.
The frame must also be executed so that so that the base
panels have either transverse or longitudinal support rails on
the underside.
HEAVY DUTY INSTALLATION
Suitable installation for sizes 036-090.
Example 1
Retaining flange A – max. 35 mm along the inspection side
unite sizes 005-090.
Cut and remove the edge ”A” at the hinge locations to
unite sizes 005-090.
Retaining flange A – max. 75 mm along the inspection side
unite sizes 081-216.
HEAVY DUTY INSTALLATION
Suitable installation for sizes 036-090.
Example 2
Important!
A frame of the kind shown in figure below
permits easy adjustment of the hangers.
max. 1,5 m
min. 800
Hangers
Clamp
cc max 600
cc max 600
3154 3;3 EUG(A,B) FIG 20
Seen from A
Hangers
Seen from A
Hangers
A
N.B.!
If the air handling unit is equipped with a
EQWZ-02 drainage trough, the edge of the
retaining flange (A) can only be at the casing
corner posts.
cc max 600
cc max 600
3154 3;6 EUG(A,B) FIG 23
Seen from B
Seen from B