3 | Assembly and Starting Operation
FISCHER Mess- und Regeltechnik GmbH
10 / 20
BA_EN_DE23
3.3.2 3-wire connection (0 ... 10 V)
supply
P1
+Sig1
-Sig1
+U
b
-U
b
channel 1
1
3
+
-
+
4
+U
b
-U
b
P2
+Sig2
-Sig2
channel 2
+
-
+
2
output1
output2
(~)
(~)
Fig. 8:
Electrical connections
Fig. 9:
M12 connector 4pol
1 channel version
Pin Description
Cable colour
1
Supply
(+)(~) +U
b
brown
2
white
3
Supply
(-)(~) -U
b
-Sig
blue
4
Output
(+)
+Sig
black
A
Coding
2 channel version
Pin Description
Cable colour
1
Supply
(+)(~) +U
b
brown
2
Output 2
(+)
+Sig2
white
3
Supply
(-)(~) -U
b
-Sig1 / -Sig2
blue
4
Output 1
(+)
+Sig1
black
A
Coding
3.4 Commissioning
A prerequisite for commissioning is correct installation of all electrical supply
lines and the pressure lines. All connections are arranged so that there are no
mechanical forces acting on the device.
CAUTION
Leak test
The pressure lines need to be checked for leaks before commissioning.
The device switches into normal mode as soon as the device is connected to a
power supply.
Содержание DE23 Series
Страница 1: ...Operating manual DE23 Differential pressure transmitter 09005097 BA_EN_DE23 Rev ST4 B 07 18 09005097...
Страница 18: ...7 Annex FISCHER Mess und Regeltechnik GmbH 18 20 BA_EN_DE23 7 Annex Fig 13 CE_DE_DE23...
Страница 19: ...FISCHER Mess und Regeltechnik GmbH Annex 7 BA_EN_DE23 19 20...
Страница 20: ...7 Annex FISCHER Mess und Regeltechnik GmbH 20 20 BA_EN_DE23...