
Installation Instructions
Seite/Page 92 Panda PMS 8.000 NE - 42 NE Manual.R05 - Kapitel/Chapter 5: Installation Instructions
22.3.11
5.9.3 AC-Control Box with VCS and ASB - not all models
The required capacitors for the excitation of the generator are located in the AC-Control box, as well as the electro-
nic control for voltage/speed regulation (VCS) and the starting current re-inforcement (ASB). The AC-Control box
must be connected by electrical wires (high voltage and low-voltage) to the generator.
The front panel must always be closed, since the AC-Control box produces 400 V during operation.
The AC-Control box must be electrically connected to the generator (high and low voltage).
Danger - High voltage
ATTENTION! Before working on the System read the "Section
Safety Instructions in this Manual".
Fig. 5.9.3-1: Opened AC Control Box
AC-Control Box
Inlet VCS-connection (X1)
Inlet measuring voltage (X3)
Excitation cable to generator (X4)
Fig. 5.9.3-2: Opened AC Control Box from Panda 30 upwards
AC-Control Box - from Panda 30 upwards
1
3
2
Содержание 6500 PMS
Страница 58: ...The Panda Generator Seite Page 58 Panda_6500_7mini_PMS_eng R01 Kapitel Chapter 4 The Panda Generator 22 3 11 ...
Страница 168: ...Seite Page 168 Panda PMS 8 000 NE 42 NE Manual R05 22 3 11 Leere Seite Intentionally blank Generator Faults ...
Страница 214: ...Seite Page 214 Panel Generator Control P6 RE0703_Kunde_eng R06 1 22 3 11 Leere Seite Intentionally blank Measurements ...