General operation
Seite/Page 146 Panel Generator Control P6+ RE0703_Kunde_eng.R06.1 - Kapitel/Chapter 11: General operation
10.5.11
11.7.3 Terminal connections
Connection for the automatic adapter X2 (row with odd pin numbers // I/O viwe from operating panel)
Fig. 11.7.3-1: Terminal connections automatic adapter
Pin-no.
Pin-name
I / O
Description
1
VBF
O
power (operation voltage behind fuse)
3
GND
O
power supply - (ground)
5
VBFS
O
power switched (voltage Pin 1, with panel switched on)
7
12V
O
power switched, at 12V-operation over closed soldered jumper J101 connected with
VBFS (at optional 24V-operation: VBFS over internal voltage regulator at 12,9V regulated)
9
GND
O
power supply - (ground)
11
GND
O
power supply - (ground)
13
/Heat-signal
I
Heat is active, if the input is switched to GND
15
/Start-signal
I
Start is active, if the input is switched to GND
17
GND
O
power supply - (ground)
19
GND
O
power supply - (ground)
21
GND
O
power supply - (ground)
23
GND
O
power supply - (ground)
25
GND
O
power supply - (ground)
27
/Stop-signal
I
The Fuel pump signal is switched off, as long as the input is switched to GND, (also when star-
ting)
29
FP-Int
O
Fuel pump signal internally, decoupled over diode from external signal
31
/Fault-signal
O
Output is switched to GND, if an error is present (inputs 3, 4, 5, 11 and 12, if configured and ge-
nerally for 2s, after switching on the panel)
33
GND
O
power supply - (ground)
Содержание 22-4 HD PVMV-N
Страница 8: ...Seite Page 8 Kapitel Chapter 2 10 5 11 12 Measurements 153 12 1 Hole pattern 153 ...
Страница 25: ...General Instructions and Regulations 10 5 11 Chapter 1 General Instructions and Regulations Page 25 ...
Страница 52: ...Seite Page 52 10 5 11 Leere Seite Intentionally blank The Panda Generator ...
Страница 94: ...Seite Page 94 Panda 8000 42NE PVMV N R01 10 5 11 Leere Seite Intentionally blank Maintenance Instructions ...
Страница 154: ...Seite Page 154 Panel Generator Control P6 RE0703_Kunde_eng R06 1 10 5 11 Leere Seite Intentionally blank Measurements ...