![Fischer Panda 10000/9 Скачать руководство пользователя страница 153](http://html1.mh-extra.com/html/fischer-panda/10000-9/10000-9_manual_2294272153.webp)
Maintenance Instructions
9.12.14
Kapitel/Chapter 9: Maintenance Instructions - Seite/Page 153
Fig. 9.17-6: Actuator
6. Remove the spindle.
Representative picture
Fig. 9.17-7: Actuator
7. Unscrew three screws on the actuator with a size 0 or 1
phillips screwdriver.
Representative picture
Fig. 9.17-8: Actuator
8. Remove the actuator.
9. To reinstall, reverse the order of steps.
10.Pull out electric starter.
11. To reinstall, reverse the order of steps.
Representative picture
9.17.1Check and discharge the capacitors
Attention!:
NEVER check the capacitors whilst the generator motor
is running! Charged capacitors can be lethal. Do not
contact the capacitors with bare fingers or non-insulated
metallic objects! In order to test the capacitors, the
terminal lead wires have to be disconnected using pliers
or a screwdriver with insulated handle(s). Once the wires
have been removed, the capacitors must be discharged
by bridging the capacitor terminals with a discharge
reactor.
Содержание 10000/9
Страница 10: ...Seite Page 10 Kapitel Chapter 2 9 12 14 Leere Seite Intentionally blank...
Страница 62: ...The Panda Generator Seite Page 62 Kaptitel Chapter 6 The Panda Generator 9 12 14...
Страница 220: ...Tables Seite Page 220 Kaptitel Chapter 11 Tables 9 12 14...
Страница 244: ...Seite Page 244 Kapitel Chapter 13 General operation 9 12 14 Leere Seite Intentionally blank General operation...
Страница 246: ...Seite Page 246 Kapitel Chapter 14 Measurements 9 12 14 Leere Seite Intentionally blank Measurements...