First Light BFL-S Series Скачать руководство пользователя страница 1

5/32” hex bit

9/16” socket

Torque wrench

Electrical Fishtape

1.

PLACE SOLAR ENGINE ON POLE

Ensure to completely insert tenon into the solar

 

engine.

2.

OPEN SOLAR ENGINE

Press the blue button on the side to unlock.

 

Once 

opened, prop stick will automatically engage to

 

keep lid 

open.

3.

AIM AND SECURE SOLAR ENGINE

Rotate 

s

olar 

e

ngine such that the green arrow points

 

south.

 

Use 5/32” bit to torque the 4x set screws to 86 

in-lb.

4.

PLACE FIXTURE ON ARM AND OPEN FIXTURE

Press

 

the button on the underside of the fixture to

 

unlock.

Solar 

E

ngine 

Push 

T

U

nlock 

Tenon 

Point 

G

reen 

A

rrow 

S

outh 

Tighten 

S

et-

S

crews 

Fixture 

Push 

T

U

nlock 

Arm 

PRIOR TO INSTALL 

The BFL is designed to be installed on either a pole laying on 
the ground, or on top of an erected pole.

 

Ensure install location 

averages 

2 to 3 hours of direct midday sun exposure for best 

performance. Please handle fixture and solar engine with care 
as scratches will affect appearance and powder coat durability

.

TOOLS REQUIRED

INSTALL INSTRUCTIONS

BFL-S SERIES STREET LIGHT

First Light Technologies 

 Document 

70-0058 | 

26

 March 2020

© First Light Technologies Ltd.

1

www.firstlighttechnologies.com 

[email protected] 

Toll Free 1-844-279-8754

Отзывы: