Before you permanently install
14
Outdoor node installation
After you do tests and configure the nodes, then you are ready to install the
nodes in a permanent outdoor location.
The work process is:
1.
Collect all required tools.
2.
Go to the site and make sure that:
-
No new safety hazards are present.
-
Link path calculations are correct.
3.
Prepare safety equipment and confirm earth ground procedures.
4.
Attach the nodes and antennas to poles that attach to a mast, tower, or roof.
5.
Install the node and antennas assembly and other devices, such as cameras
or access points to a permanent location.
Tools required
For HotPort 5020 edge nodes, you need to have:
•
#2 Phillips screwdriver
•
Small adjustable wrench
•
Wire cutters to cut tie wraps around cables
•
Electrical tape and butyl mastic or silicone tape to weatherproof the
connectors
Other equipment you might need includes:
•
Ladder
•
Lift truck
•
Safety equipment
Making sure the site is ready for installation
Before you install any equipment outside, check the entire site:
•
To identify possible hazards that might be new since the original site survey
•
To identify the presence of objects that might cause interference for the
radios
Содержание HotPort 5020
Страница 1: ...HotPort FiretideInstallationGuide HotPort 5020 Edge Nodes Published March 2014 Revised 2016...
Страница 2: ......
Страница 8: ......
Страница 12: ...HotPort 5020 edge nodes 4...
Страница 21: ...Beforeyoupermanentlyinstall 13...
Страница 41: ...Troubleshooting 33...