![Filtec FT-50c Скачать руководство пользователя страница 209](http://html1.mh-extra.com/html/filtec/ft-50c/ft-50c_service-and-technical-reference-manual_2288783209.webp)
FT-50 Fill Level Inspector Service Manual
8-18
How to replace the software PROMs.
The software PROMs must be replaced as a set. Each PROM is
labelled as either U25 or U26 (refer to figure 8-5).
1.
Locate PROMs U25 and U26. These are the PROMs that
contain the machine software.
2.
Carefully remove each PROM with a PROM puller.
3.
Carefully align and then insert PROM U25 into socket U25. Do
not force the PROM. If you break the pins you must reorder the
PROM.
4.
Carefully align and then insert PROM U26 into socket U26. If
PROM U26 is shorter than the PROM socket, align the left side
of the PROM and socket so that the excess socket length is on
the right. Do not force the PROM. If you break the pins you
must reorder the PROM.
If LED 12 indicates CPU has locked up.
If LED 12 (also called the “Watchdog LED”) on the Processor Card
is on, this indicates the CPU has locked-up. This could indicate a
software failure or processing error. Reboot the machine and begin
operations.
Serial Communications Card
Serial communications cease.
Check to be certain Serial Communications has not been deacti-
vated. If not, the terminal board is malfunctioning and must be
replaced.
The Control Panel
If the display does not change when keys are pressed:
1.
Turn the FT-50’s power off and press the reset button and turn
on the power to the machine. Wait for the three beeps before
releasing the Reset Button.
2.
Remove the FT-50’s cover and verify the ribbon cable from the
touchpad is undamaged and properly connected to the
terminal board.
3.
Inspect the control panel display touchpad for water damage.
If moisture is present, replace the control panel.
Industrial Dynamics Company, Ltd. Document 40255-0600
Содержание FT-50c
Страница 1: ...FT 50c Service and Technical Reference Manual 40255 0600 ...
Страница 2: ...FT 50c Fill Level Inspector Service and Technical Reference Manual Document 40255 0600 ...
Страница 13: ...FT 50 Fill Level Inspector Service Manual XII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 19: ...FT 50 Fill Level Inspector Service Manual XVIII Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 21: ...FT 50 Fill Level Inspector Service Manual 1 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 33: ...FT 50 Fill Level Inspector Service Manual 1 14 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 35: ...FT 50 Fill Level Inspector Service Manual 2 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 39: ...FT 50 Fill Level Inspector Service Manual 2 6 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 41: ...FT 50 Fill Level Inspector Service Manual 3 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 71: ...FT 50 Fill Level Inspector Service Manual 4 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 99: ...FT 50 Fill Level Inspector Service Manual 5 4 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 139: ...FT 50 Fill Level Inspector Service Manual 5 44 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 141: ...FT 50 Fill Level Inspector Service Manual 6 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 185: ...FT 50 Fill Level Inspector Service Manual 7 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 191: ...FT 50 Fill Level Inspector Service Manual 7 8 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 219: ...FT 50 Fill Level Inspector Service Manual 9 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 227: ...FT 50 Fill Level Inspector Service Manual 10 2 Industrial Dynamics Company Ltd Document 40255 0600 ...
Страница 237: ...FT 50 Fill Level Inspector Service Manual 10 12 Industrial Dynamics Company Ltd Document 40255 0600 ...