Go to fetco.com for the latest versions of all information
Page 6
CBS-7000
Series Brewers & Dispensers
P186 JANUARY 2020
Electrical connection
•
Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer’s serial number plate. Make sure the electrical service includes
neutral
.
•
A fused disconnect switch or circuit breaker on the incoming power line must be conveniently located near the
brewer, and its location and markings known to the operators.
•
The body of the brewer must be grounded to a suitable building ground. A ground lug is provided in the brewer
next to the power terminal block. Use only 10 gauge copper wire for grounding.
•
Make sure that both power switches are in the “off” position. The buttons should be in the “out” position.
•
Connect the power, neutral, and ground wires to the terminals in the brewer.
TERMINAL BLOCK
GROUND
WIRE
L1 L2 L3
N
120V
208-240V
208-240V
208-240V
GROUND
LUG
1
2
3
CORD WITH 5-15P
NEMA PLUG
TERMINAL BLOCKS
GROUND
LUG
GROUND
WIRE
L1 L2 L3
480 V
480 V
480 V
GROUND
LUG
TO 120V OUTLET
Electrical Connection - 240 volts, 3 phase
Electrical Connection - 480 volts, 3 phase
•
Turn on the building circuit breaker.
Do not turn on the brewer’s power switches yet.
•
At the brewer’s terminal block, verify that the correct voltage is between terminals, according to the diagram
above.
•
CBS-71A - press the power switch. CBS-72A - press only the power switch on the brewer’s left side. The power
switch will illuminate. After a delay of 5-6 seconds, the tank should begin filling with water.
•
CBS-72A - You can press the right side power switch at any time to begin filling the other tank, but this will cause
the first tank to fill more slowly. To fill the first tank as fast as possible, wait until it has filled completely before
pressing the right side power switch.
•
The heating process will begin after the water has reached a safe level, but before the tank has filled completely.
Approximately 10-15 minutes after the tank has filled, the ready light will illuminate, indicating that this side of the
brewer is at the proper temperature and ready to operate.
Power Management System
Available only as factory installed for CBS-72 (dual) models
Power management operates one side of the CBS-72 tank heaters. High amperage power requirement is
reduced with power management by not operating both sides tank heaters. When brew is started, power to
heaters is turned off on the brewing side and only operates the on the other, not-brewing, side if needed. If
brew “START” is activated while the tank is heating, the ready light flashes while tank heats to the setpoint.