Festo — YXCR — 2021-07b
Assembly
63
6.5.3.2
Mounting Z-module DHMZ-DGST on Y-module EHMY-...-ELGC
Requirements:
–
The Y-module is mounted.
–
The moving parts are secured with the transportation locks.
Fig. 62: Mount Z-module DHMZ-DGST, example
1. Press the centring sleeves into the holes of the Y-Z adapter plate on the Y-module.
2. Place the Z-module on the Y-Z adapter plate of the Y-module.
3. Fasten the Z-module to the Y-Z adapter plate with at least 2 screws through the housing. Secure
the screws with an adhesive for locking screws.
DHMZ-DGST-
8
12
16
20
EHMY-RP-ELGC-
45
45/60
60/80
80
Screw size
M3 x 20
M4 x 30
M5 x 30
M6 x 45
Tightening torque
[Nm]
1.2
2.4
4.8
6.0
Removing transportation locks
Fig. 63: Identification of the transportation lock for moving parts
•
On the product, remove all marked transportation locks from the moving parts.
Содержание YXCR
Страница 1: ...YXCR Three dimensional gantry Operating instruc tions 8087868 2021 07b 8087870...
Страница 2: ...Translation of the original instructions...
Страница 107: ......