88
Festo — YXCF — 2021-07b
Installation
Connect earthing points
2
2
2
3
3
3
1
1
1
Fig. 59: Connection for earthing points, example
1
Earthing point
2
Serrated washer
3
Washer
1. Position serrated washer.
2. Place the cable lugs of the earthing cables between the serrated washer and the washer.
3. Tighten the nut or screw. Tightening torque: 3.5 Nm