5. Maintenance and conversion
5−10
Festo P.BE−CPVSC−E N en 0301a
4. Align the CPV−SC valve terminal components so that they
are not offset.
5. Tighten both tie rods at first only slightly and then with
0.8 Nm (+ 0.2 Nm).
5.3.4
Fitting the CPV−SC valve terminal
·
Then fasten the right−hand fastening to the wall with two
M3 screws of sufficient length (tightening torque 0.6 Nm
(+ 0.2 Nm)).
·
Complete the pneumatic and electric connections
(seechapter 3).
Содержание Smart cubic CPVSC1-VI
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Страница 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Страница 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Страница 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Страница 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Страница 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Страница 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Страница 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Страница 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Страница 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Страница 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Страница 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Страница 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...