1. Installation CPV−DI02 and CPV−CS02
1−10
Festo P.BE−CPV−DI02−EN en 0704NH
1.2.4
Recognizing the CPI extension with the SAVE button
When the SAVE button is pressed, the CPI/CP modules con
nected to the CPI extension connection will be recognized
automatically.
1. Prepare the connection of the CPV Direct to the power
supply (see section 1.5).
2. Read the sections 1.6 Extending the CPV Direct" and 1.7
Preparing the CPI system for commissioning" for the
exact procedure.
1.2.5
Help table for setting the station number
On the following pages you will find help tables for setting the
station numbers with the DIL switch.
Содержание PROFIBUD-DP
Страница 2: ......
Страница 15: ...Installation CPV DI02 and CPV CS02 1 1 Festo P BE CPV DI02 EN en 0704NH Chapter 1...
Страница 58: ...1 Installation CPV DI02 and CPV CS02 1 44 Festo P BE CPV DI02 EN en 0704NH...
Страница 59: ...Commissioning CPV DI02 PROFIBUS DP 2 1 Festo P BE CPV DI02 EN en 0704NH Chapter 2...
Страница 79: ...Diagnosis CPV DI02 PROFIBUS DP 3 1 Festo P BE CPV DI02 EN en 0704NH Chapter 3...
Страница 107: ...Commissioning CPV CS02 ABB CS31 4 1 Festo P BE CPV DI02 EN en 0704NH Chapter 4...
Страница 116: ...4 Commissioning CPV CS02 ABB CS31 4 10 Festo P BE CPV DI02 EN en 0704NH...
Страница 117: ...Diagnosis CPV CS02 ABB CS31 5 1 Festo P BE CPV DI02 EN en 0704NH Chapter 5...
Страница 131: ...Technical appendix A 1 Festo P BE CPV DI02 EN en 0704NH Appendix A...
Страница 146: ...A Technical appendix A 16 Festo P BE CPV DI02 EN en 0704NH...
Страница 147: ...Index B 1 Festo P BE CPV DI02 EN en 0704NH Appendix B...
Страница 148: ...B Index B 2 Festo P BE CPV DI02 EN en 0704NH Contents B Index B 1...
Страница 154: ...B Index C 8 Festo P BE CPV DI02 EN en 0704NH...