A. Technical appendix
A−5
Festo P.BE−MPAL−EN en 1008NH
Note
For wall mounting additional mountings may need to be
installed (see Chapter 2.3).
General information
Vibration and shock
4)
Vibration
Shock
Continuous shock
Tested as per DIN/IEC68/EN60068 Par ts 2 − 6,
With horizontal H−rail mounting: Severity level 1
For wall mounting: Severity level2
2) 3)
Tested as per DIN/IEC68 / EN60068 parts 2 − 27
With horizontal H−rail mounting: Severity level 1
For wall mounting: Severity level2
2) 3)
Tested as per DIN/IEC68 / EN60068 parts 2 − 29,
For wall and H−rail mounting: Severity level 1
1) Load carrying ability specifications for vibration and shock of the CPX terminal can be found in the
CPX system manual.
2) Valve terminal MPA−L with multi−pin plug connection:
up to a length of 200mm of the v alve terminal without additional fastening
from 200mm length of the v alve terminal every 130mm additional mountings must be used
3) Valve terminal MPA−L with CPX terminal:
up to a length of 200mm between the pneumatic interface and the right−hand end plate, without
additional mounting
from a length of 200mm between pneumatic interface and right−hand end plate every 130mm
additional mountings must be used
4) See following table for explanations of the severity levels.
Tab.A/2: Load carrying ability for vibration and shock
Severity level Vibration
Shock
Continuous shock
1
0.15mm Amplitude at 10...58 Hz;
2 g acceleration at 58...150 Hz
±15g at 11ms duration;
5 shocks in each
direction
±15g at 6ms
duration;
1000 shocks in each
direction
2
0.35mm Amplitude at 10...60 Hz;
5g acceleration at 60...150Hz
±30 g for 11ms duration;
5 shocks in each
direction
Tab.A/3: Values for vibration and shock as per DIN/IEC68
Содержание MPA-L Series
Страница 2: ......
Страница 8: ...Contents and general safety instructions VI Festo P BE MPAL EN en 1008NH ...
Страница 15: ...Overview of components 1 1 Festo P BE MPAL EN en 1008NH Chapter 1 ...
Страница 40: ...1 Overview of components 1 26 Festo P BE MPAL EN en 1008NH ...
Страница 41: ...Mounting 2 1 Festo P BE MPAL EN en 1008NH Chapter 2 ...
Страница 55: ...Installation 3 1 Festo P BE MPAL EN en 1008NH Chapter 3 ...
Страница 85: ...Commissioning 4 1 Festo P BE MPAL EN en 1008NH Chapter 4 ...
Страница 100: ...4 Commissioning 4 16 Festo P BE MPAL EN en 1008NH ...
Страница 101: ...Conversion and maintenance 5 1 Festo P BE MPAL EN en 1008NH Chapter 5 ...
Страница 128: ...5 Conversion and maintenance 5 28 Festo P BE MPAL EN en 1008NH ...
Страница 129: ...Technical appendix A 1 Festo P BE MPAL EN en 1008NH Appendix A ...
Страница 141: ...Supplementary overview of components B 1 Festo P BE MPAL EN en 1008NH Appendix B ...
Страница 150: ...B Supplementary overview of components B 10 Festo P BE MPAL EN en 1008NH ...
Страница 151: ...Index C 1 Festo P BE MPAL EN en 1008NH Appendix C ...
Страница 152: ...C Index C 2 Festo P BE MPAL EN en 1008NH Contents C Index C 1 ...