Assembly instructions (Original: de)
8041718
1411a
†‡
Pilot line
KES-MC-1-SUB-9-...
Festo SE
& Co. KG
Postfach
73726 Esslingen
Germany
+49 711 347-0
www.festo.com
1. Parts list
7428d_1
1
Cable
Motor side:
2
Socket (9-pin)
3
Screw
Controller side:
4
Wire end sleeve
AWG 26 (0.14 mm²)
5
Ring cable lug
for earthing with
M4-screw
(1x)
(1x)
(1x)
(9x)
(1x)
2. Pin allocation
7428d_3
7428d_2
3. Technical data
KES-MC-1-SUB-9-...
Cable composition
[mm²]
10 x 0.14
Cable diameter
D
[mm]
7
Min. cable bending radius
R
[mm]
with flexible installation
51
with fixed installation
28
Mounting space
A
[mm]
140
Protection class (in mounted status)
IP 54
Ambient temperature
[°C]
0 … +50
Note on materials
Contains PWIS
1)
1)
PWIS = Paint-wetting impairment substances
4. Mounting cables in an energy chain
1. Lay the chain out lengthwise.
2. Place the cables in the chain, making sure they are not twisted.
3. Separate cables from each other through separator/drill holes.
4. Do not connect cables together.
5. Comply with space X. X
,
10 % of the cable diameter D.
With vertically hanging chain, increase the space X.
7435d_3
6. Align chain in the operating position.
Check:
– The bending radius of the cables is at least R
– Cables are freely movable in the return bend
– Cables are not forced through the chain.
7435d_4
7. Mount chain (
corresponding assembly instructions).
8. Fasten cables:
– For short energy chains, fasten at both ends of the chain (
Fig. 1)
– For long, sliding energy chains, fasten only at the moment compensator
end (
Fig. 2).
9. Do not move cables up to the fastening point.
Check:
– The distance between the end point of the bending movement and the at-
tachment of the cable is at least equal to mounting space A.
Fig. 1
7435d_2
Fig. 2
7435d_1
Note
Chain break.
Damages to cables.
Replace cables.
Note
Malfunction and material damage due to vertically hanging cables.
The cables stretch.
Regularly check the length of the cables.
Readjust cables if required.
2
M
A
= 0.1 Nm
_
20 %
1
5
3
4
2
Shield connection
Screening