2. Commissioning
2−33
Festo P.BE−CPX−FB32−EN en 0605NH
2.5
C
h
ec
k l
ist
for
c
o
mmissi
o
nin
g
t
h
e
C
P
X
te
r
mina
l w
it
h FB32
·
Please observe the general commissioning instructions in
the CPX system manual.
·
Check the DIL switch settings and the network configur
ation before using and replacing CPX terminals.
·
Check the configured address range. If necessary, test the
I/Os.
·
Check the address assignment of the I/Os on the CPX
terminal. For this purpose you can, if necessary, force the
I/Os (see CPX system manual).
·
Make sure that the desired parametrizing of the CPX ter
minal in the start−up phase or after field bus interruptions
is restored by the plug−in module. This is to ensure that if
the CPX terminal is replaced, the new terminal will also be
operated with the desired parameter settings.
·
Use spot checks if necessary to check the parametrizing,
e.g. with the configuration program or with the Handheld.
Содержание CPX-FB32
Страница 2: ......
Страница 8: ...Contents and general instructions VI Festo P BE CPX FB32 EN en 0605NH...
Страница 16: ...Contents and general instructions XIV Festo P BE CPX FB32 EN en 0605NH...
Страница 17: ...Installation 1 1 Festo P BE CPX FB32 EN en 0605NH Chapter 1...
Страница 35: ...Commissioning 2 1 Festo P BE CPX FB32 EN en 0605NH Chapter 2...
Страница 68: ...2 Commissioning 2 34 Festo P BE CPX FB32 EN en 0605NH...
Страница 69: ...Diagnosis 3 1 Festo P BE CPX FB32 EN en 0605NH Chapter 3...
Страница 86: ...3 Diagnosis 3 18 Festo P BE CPX FB32 E N en 0605NH...
Страница 87: ...Technical appendix A 1 Festo P BE CPX FB32 EN en 0605NH Appendix A...
Страница 91: ...Ethernet IP Objects of the CPX FB32 B 1 Festo P BE CPX FB32 EN en 0605NH Appendix B...
Страница 131: ...Index C 1 Festo P BE CPX FB32 EN en 0605NH Appendix C...
Страница 132: ...B Index C 2 Festo P BE CPX FB32 EN en 0605NH Contents C Index C 1...