8.4
Disconnecting the cables
1. Switch off the power supply.
2. Disconnect the cables.
9
Commissioning
In order to avoid connecting and addressing errors, commissioning of the automation system CPX-AP
must be carried out as follows:
1. Check assembly and connections.
2. Configure the settings on the interface.
3. Check the function of the automation system CPX-AP (without higher-level control).
4. Commissioning in network (with higher-order controller).
9.1
Checking assembly and connections
1. Check the mounting of modules to ensure they are firmly seated.
2. Check connection of functional earth FE.
3. Check that connected lines are seated firmly.
9.2
Configuring the settings on the interface
•
If necessary, configure the settings using the control elements on the interface.
Detailed information on the control elements of the respective interface
è
Product-specific documentation
9.3
Check the function of automation system CPX-AP
(without higher-level control)
1. Switch on power supplies PS and PL.
2. Check the behaviour of the automation system CPX-AP:
–
Connected actuators
–
LED displays
The following LED displays must be illuminated green:
–
[SD] System diagnostics (only available for interfaces)
–
[MD] Module diagnostics (available for all modules)
–
[PL] Voltage PL (only available for interfaces, electrical interfaces and modules with out-
puts)
9.4
Commissioning in network (with higher-order controller)
Information on commissioning on the network
è
Instructions for the respective interface
Commissioning
20
Festo — CPX-AP — 2019-06