Ferroli 20-V Скачать руководство пользователя страница 1

INSTALLATION AND OPERATION MANUAL

GB

FCP 

20-V - 30-V - 40-V

Wall-mounted Fan coil

18

°C

Содержание 20-V

Страница 1: ...INSTALLATION AND OPERATION MANUAL GB FCP 20 V 30 V 40 V Wall mounted Fan coil 18 C...

Страница 2: ...the appliance complies with the European Machine Directive governing safety matters The quality level is constantly supervised thus FERROLI products stand for Safety Quality and Reliability Ask the De...

Страница 3: ...UNIT 7 ELECTRICAL CONNECTIONS 7 WIRING DIAGRAMS 8 INSTALLATION OF THE UNIT 8 OTHER POSITIONS FOR INSTALLATION 10 WET CONNECTIONS 11 CONDENSATION DRAINAGE 11 AIR VENT 12 SETTING AT WORK 13 USE OF THE...

Страница 4: ...he haulage contractor of its entity and inform our customer management office Only in this way will you be able to receive the missing mate rials or reimbursement of damages in the fastest possible wa...

Страница 5: ...med W 2900 3800 5500 min W 2550 3300 4800 Water flow rate 1 l h 292 387 568 Water pressure drop on wet side 1 Kpa 14 0 17 0 24 0 Heating capacity 2 max W 2500 3400 5000 Water pressure drop on wet sid...

Страница 6: ...es Carefully read the stickers on the machine Never cover them Replace them immediately should they be damaged Do not use the machine in an explosive atmosphere The power line must be regularly ground...

Страница 7: ...e top side of the box 3 Take hold of the unit and lift it fully out of the box 4 Remove the side protections and take off the nylon wrapping UNITS OPENING 1 Remove the screws and take off the front pa...

Страница 8: ...act positions of the expansion plugs and the hole that passes through the wall MACHINE INSTALLATION Models 30 V 40 V WIRING DIAGRAMS To allow the conditioner to operate the electrical connections must...

Страница 9: ...OTHER POSITIONS FOR INSTALLATION section 5 Make a 70 mm hole in the wall Fig 2 slightly slanting towards the outside Now begin to drill on one side of the walll A and terminate from the opposite side...

Страница 10: ...y to the required direction 3 Make the cooling pipe connections between the pipes of the interior unit and those of the exterior unit MACHINE INSTALLATION 7 Raise and carefully turn the pipe sections...

Страница 11: ...eals Model Couplings 20 V 1 2 30 V 40 V MACHINE INSTALLATION CONDENSATION DRAINAGE The following procedure makes sure that any condensation that forms flows correctly out of the machine 1 Connect the...

Страница 12: ...e that the valve opens This allows water to start entering the coils 2 Check to make sure that there are no leaks from the wet connections If there are no leaks open the air vent will now start to lea...

Страница 13: ...e settings made via the unit s remote control 5 TEMP TIME Keys for selecting the TEMPERATU RE TIME Allow the user to select the ambient temperature in the room and the timer clock increases the settin...

Страница 14: ...d more rapidly than the normal operating mode SLEEP mode press the SLEEP key to preset the machine for the overnight mode shown by the relative symbol on the display 1 nin the Cooling mode COOL the te...

Страница 15: ...time setting SETTING AT WORK EMERGENCY KEY OF THE UNIT The ON OFF emergency key is situated on the front of the unit It allows the unit to be powered and or switched off if the remote con trol is fau...

Страница 16: ...er with activated carbon 1 Remove the plug from the power socket 2 Raise the front panel 3 Remove the intake grille by pulling it outwards 4 Slip it out of its guide 5 Only clean with a blast of air D...

Страница 17: ...The manufacturer declines all liability for inaccuracies in this manual when due to printing or typing errors...

Страница 18: ...Ferroli spa 37047 San Bonifacio Verona Italy Via Ritonda 78 A tel 39 045 6139411 fax 39 045 6100933 www ferroli it Code 3QE24542...

Отзывы: