background image

13

13

ENGLISH

3. GENERAL SAFETY RULES

- The lifting tower is an industrial element designed to raise loads vertically, it must NEVER 

be used as a platform elevator for people.
- Only place the lifting tower on firm flat grounds checking it is in vertical position. Do not 

use wedges or any strange elements to balance the hoist.
- Check legs are correctly assembled and secured by their safety pins.
- Never raise a load without first checking it is correctly supported and centred on the appro-

priate lifting tower supports, so the load only acts vertically.
- Never surpass the maximum load capacity indicated on the lifting tower characteristics label 

and on this instruction manual.
- If there is a likelihood of strong wind or gusts, place the lifting tower on the ground and 

secure it with the aid of straps.
-Never fix a strap over a vehicle or any other element which might move.
- Never use a ladder over the lifting tower or lean against it for any kind of work.
- Beware of any kind of projection above the lifting tower like cornices, balconies, luminous 

signs, etc. It is very important to avoid the presence of cables below the lifting tower’s working 

height.
- Never move the lifting tower when the load is raised. It is inadvisable to make any kind of 

movement, even small positioning adjustments.
- Never use the lifting tower over any mobile surface or vehicle.
- Before using the lifting tower, check the cable’s state, which must not present any broken 

threads or compression. NEVER use defective cables and change cable if in doubt. Only use 

steel cable as described on this manual.
- Fix the lever when the load is raised.
- Minimum load for braking function without problems is 25kg. Brake will not function 

without this minimum load.
- Neither grease nor lubricate the winch brake mechanism. Braking disks were greased with a 

special heat and pressure resistant grease. No other products must be used to prevent negative 

influence on brake functioning.
- All sections of the lifting tower must be lowered to transport it.

Содержание AT-04B

Страница 1: ...erie Serial No Instrucciones Instructions Fabricante Manufacturer FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixs...

Страница 2: ...2 2 FENIX STAGE S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain...

Страница 3: ...liability the conformity of the product Name Model Description to which this declaration refers as per the following regulations CE 2006 42 EG Person empowered to compile the technical file and autho...

Страница 4: ...sions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusiones Conclusions Fecha Date Verificador Verifier Firma Signature Partes comprobadas Tested parts Conclusio...

Страница 5: ...p g 8 seguir las instrucciones de uso ver punto 4 p g 9 un manteniminto peri dico ver punto 5 p g 10 conocer los sistemas de prevenci n ver punto 7 p g 11 BGV C1 is a regulation for staging and pro d...

Страница 6: ...E SEGURIDAD 8 4 INSTRUCCIONES DE USO 9 5 MANTENIMIENTO 10 6 RIESGOS ESPEC FICOS 10 7 SISTEMAS DE PREVENCI N 11 INDEX 1 INTRODUCTION 12 2 GENERAL DATA 12 2 1 Technical data 12 2 2 Applicable regulation...

Страница 7: ...naci n TORRE ELEVADORA Modelo AT 04B Caracter sticas t cnicas Altura m xima 5 00m Altura m nima 1 59m Carga m xima 200kg Carga m nima 25kg Material Aluminio seg n AL Si 6082 T6 rea de la base abierta...

Страница 8: ...elevadora ni apoyarlas en l para realizar ning n tipo de trabajo Tenga cuidado con todo tipo de salientes por encima de la torre elevadora como cornisas balcones letreros luminosos etc Es muy importa...

Страница 9: ...ga Ver fig 3 p g 17 7 Elevaci n Para elevar los perfiles hay que seguir un orden concreto El primer perfil que hay que subir siempre ser el m s aleja do del cabestrante Liberar el gatillo de segu rida...

Страница 10: ...os de carga E en posici n vertical y bajar el ca rro X girando la manivela del cabestrante B ejerciendo un poco de presi n sobre el carro X Meter las patas H en su sopor te para transporte C ajustando...

Страница 11: ...N Sobre fallo del sistema de freno Disponer de cabestrante conforme a las nor mas mencionadas en la directiva de seguri dad BGV C1 especialmente DIN EN ISO 12100 2011 03 y DIN EN ISO 12100 1 2004 04 S...

Страница 12: ...AT 04B Technical characteristics Maximum height 5 00m Minimum height 1 59m Maximum load 200kg Minimum load 25kg Material Aluminium AL Si 6082 T6 Workspace 1 45 x 1 49m Closed base area 0 38 x 0 48m W...

Страница 13: ...lifting tower or lean against it for any kind of work Beware of any kind of projection above the lifting tower like cornices balconies luminous signs etc It is very important to avoid the presence of...

Страница 14: ...loading instructions See fig 3 page 17 7 Elevation To lift the profiles a specific or der must be followed The first profile to be raised will always be the one located furthest from the winch Release...

Страница 15: ...he safety pins A in closed position S Move the forklifts E in vertical position and lower the carriage X by turning the winch handle B and pressing down a little on the carriage X Place the outriggers...

Страница 16: ...tions metioned in the BGV C1 directive spe cially DIN EN ISO 12100 2011 03 and DIN EN ISO 12100 1 2004 04 About loss of stability Maintenance of lifting tower stability must basically be as per the f...

Страница 17: ...17 Distancia Distance Carga m xima Maximum load 20cm 200kg 45cm 160kg Distancia del centro de la carga a la torre Distance from the center of the load to the tower Figura 2 Figura 3 20cm 45cm...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ......

Страница 23: ...23 NOTAS NOTES LIFTING TOWERS...

Страница 24: ...FENIX Stage S L U FENIX Stage S L U Avda de los Trabajadores 24 Horno de Alcedo 46026 Valencia Spain Tel 34 96 125 08 55 export fenixstage com www fenixstage com www fenixstage com...

Отзывы: