10
en
Emission values for vibration
Determined with a 45° bevel.
Material being worked: S235JR, material
thickness: 30 mm
Work procedure
Weighted
acceleration*
1. workstep
(c = 3 mm)
4.0 m/s
2
2. workstep
(c = 5 mm)
4.6 m/s
2
K
1.5 m/s
2
* This measured value depends on the material
and application and can therefore also be
exceeded.
Содержание AKFH18-5 Series
Страница 1: ...AKFH18 5 7 138 01 AKFH18 5T 7 138 02...
Страница 2: ...2 Instruction Manual Mode d emploi Instrucciones de uso en 3 fr 37 es 71...
Страница 35: ...35 en Provided accessories figure 19 4 mm Torx screwdriver Allen key Screw Copper paste Fig 19 TX 15 3 x...
Страница 83: ...83 es Fig 2 AKFH18 5T rea de agarre Switch Rueda de ajuste de velocidad Bot n de retenci n Plato gu a Bater a...