System Options:
Quick Loader
9-78
INSTALLATION
The Quick loader is pre-installed in FEI factory. No special adjustment
is needed only the loading rod was uninstalled for transport.
1.
Unpack the lead glass lid.
2.
Remove four screws holding the cover of the loading rod
feedthrough.
3.
Use the same screws to attach the loading rod to the loader
chamber.
Loading position
The load / unload position is preset from factory. If a calibration is
needed, run the alignment
350 - Quick Loader Alignment
at first.
Содержание Quanta FEG 250
Страница 8: ...C vi...
Страница 28: ...System Operation Quanta FEG System States 3 10...
Страница 108: ...Alignments 1 Gun Alignment 6 6...
Страница 114: ...Alignments 154 Water Bottle Venting 6 12 154 Water Bottle Venting...
Страница 152: ...System Options Automatic Aperture System 9 4...
Страница 154: ...System Options Nav Cam 9 6 401 NAV CAM AUTOBRIGHTNESS...
Страница 177: ...System Options Cooling Stage Waterless Cooling Stage 9 29...