background image

1-800-888-2418 | www.feeneyinc.com

5

For systems with ligh  ng installed into Series 150 top rail: 

Drill an 11/16” diameter hole ver  cally centered between the 
factory pre-drilled top rail RCB holes.  This will allow the light 
strip and connector to pass through the RCB hollow 

(See Figure 

1.4).

  Repeat this step for each post which will have light strips 

running through it.  For stair posts, pre-drill top rail RCB holes as 
needed, and then pre-drill 11/16" diameter hole.

Pull starter cable out through drilled hole between RCB holes, 
and a  ach LED Connector (Female) to Starter Cable 

(See Figure 

1.5).

IMPORTANT NOTE:  

Maintaining the polarity at all con-

nec  on points is cri  cal.  Constant alignment veri

fi

 -

ca  on of the of the posi  ve and nega  ve signs  will 
guarantee less problems and rework. 

Use masking tape to temporarily secure starter cable to outside 
of post to prevent retrac  ng back into post.

For systems with ligh  ng installed into Bo  om Rail:

 Drill an 

11/16” dia. hole, at 9/16” below and centered between the 
bo  om rail RCB holes 

(See Figure 1.6).

  Repeat this step for each 

post which will have light strips running through it.  For stair 
posts, pre-drill bo  om rail RCB holes as needed, and then pre-
drill 11/16" diameter hole.

Pull starter cable out through drilled hole between RCB holes, 
and a  ach LED Connector (Female) to Starter Cable 

(See Figure 

1.7).

IMPORTANT NOTE:  

Maintaining the polarity at all con-

nec  on points is cri  cal.  Constant alignment veri

fi

 -

ca  on of the of the posi  ve and nega  ve signs  will 
guarantee less problems and rework. 

Use masking tape to temporarily secure starter cable to outside 
of post to prevent retrac  ng back into post.

Step 1B - Con  nued

11/16" HOLE

1-3/16"

1/2"

TOP OF POST

Figure 1.4

1-3/16"

11/16" HOLE

9/16"

BOTTOM OF POST

Figure 1.6

Figure 1.5

LED CONNECTOR 
(FEMALE)

STARTER CABLE

Figure 1.7

LED CONNECTOR 
(FEMALE)

STARTER CABLE

MALE CONNECTOR 

FEMALE CONNECTOR

Keep the straight line 
on the outside ma

 ng 

connec

 on aligned

MALE CONNECTOR 

FEMALE CONNECTOR

Keep the straight line 
on the outside ma

 ng 

connec

 on aligned

Содержание Feeney DesignRail 24V LED Lighting V2,

Страница 1: ...aximum length of strip ligh ng that can be connected in one run is 55 feet Building codes vary by loca on and jurisdic on Consult all applicable codes before installing DesignRail LED Ligh ng DesignRail LED Ligh ng may not be suitable for every applica on and it is the sole responsibility of the installer to ensure that DesignRail LED Ligh ng is used for its intended purpose WARNING ELECTRIC SHOCK...

Страница 2: ... 1x 60 Wa Dimmable Driver 1x Starter Cable 20 1x Wire Nuts Pair 1x Isola on Bushing 96W Driver Kit SKU LED 96W DK 1x 96 Wa Dimmable Driver 1x Starter Cable 20 1x Wire Nuts Pair 1x Isola on Bushing LED Light Strip SKU LED 05 to LED 55 LED EXTENSION CABLE 132 SKU LED EXT132 LED CONNECTOR PAIR includes tube of silicone SKU LED CONN LED CRIMP CONNECTOR 8 SKU LED CC8 LED SPLICE CONNECTOR 5 pack SKU LED...

Страница 3: ... power source to loca on of driver Connect drivers to dimmer switch AC power source Connect 20 starter cable and route from driver to post using supplied wire nuts 1 Power by customer 2 Light Switch by customer 1 3 24v Dimmable Driver 2 4 LED Starter Cable 20 5 LED Connector Pair Female Connector 6 LED Light Strip LIGHTING COMPONENTS 1 Mount ver cally only See Switch Compatabilty Spec Sheet at www...

Страница 4: ...Connector Female to Starter Cable See Figure 1 3 IMPORTANT NOTE Maintaining the polarity at all connec on points is cri cal Constant alignment verifica on of the of the posi ve and nega ve signs will guarantee less problems and rework Use masking tape to temporarily secure starter cable to outside of post to prevent retrac ng back into post WIRE COMES UP THROUGH DECKING AND INTO POST WIRE CAN BE R...

Страница 5: ...stalled into Bo om Rail Drill an 11 16 dia hole at 9 16 below and centered between the bo om rail RCB holes See Figure 1 6 Repeat this step for each post which will have light strips running through it For stair posts pre drill bo om rail RCB holes as needed and then pre drill 11 16 diameter hole Pull starter cable out through drilled hole between RCB holes and a ach LED Connector Female to Starte...

Страница 6: ...ions should be equal Cut top rail insert for ligh ng to fit on each side of the picket Install top rail insert on each side of picket Avoid pinching starter cable by star ng insert at a slight angle and rota ng up and snapping into top rail See Figure 2 3 Secure intermediate picket to top rail using 2x 8 x 1 self tapping screws See Figure 2 4 For systems with ligh ng installed into Series 150 top ...

Страница 7: ...rt to fit between posts Trim channel por on of isert at both ends to clear RCBs This can be done by cu ng the top of the channel to a point just above the flanges then snipping the sides to remove See Figure 2 6 Install bo om rail insert between posts See Figure 2 7 Figure 2 6 1 1 4 Figure 2 7 BOTTOM RAIL BOTTOM RAIL INSERT STARTER CABLE WITH LED CONNECTOR Figure 2 5 MEASURE Step 2 Con nued ...

Страница 8: ...the end of the light strip just enough so that it is out of the way of where the connector will be placed Use the provided silicone and affix the clear plas c sleeve to the end of the light strip make sure window opening is oriented so that the copper dots are aligned in opening See Figure 3 3 The end of the light strip is now ready to be snapped into the connector Snap the light strip onto the star...

Страница 9: ... nue the en re light strip along the length of the top rail passing the light strip over the top of the posts and pickets For systems with ligh ng installed into Series 150 top rail Con nue the en re light strip along the length of the top rail passing the light strip over the intermediate pickets through the pre drilled holes and RCBs in the channel of the Series 150 top rail For systems with lig...

Страница 10: ...el Post with Series 200 300 350 450 top rail and bo om rail on level and Series 150 and bo om rail on stairs Single Corner Post with Series 200 300 350 450 top rail and bo om rail Double Corner Post with Series 200 300 350 450 top rail and bo om rail Ligh ng in Series 200 300 350 or 450 Top Rail and Bo om Rail Details ...

Страница 11: ...ble Corner Posts with Series 150 top rail Single Corner Post with Series 150 top rail Intermediate Post with series 150 top rail At the exposed termina on end of the light strip where no more connec ons will be made roll back the adhesive tape Use the provided silicone and affix an end cap See Figure 3 4 END CAP Figure 3 4 ...

Страница 12: ...s shown See Figure 4 2 For systems with ligh ng installed into Series 150 top rail Follow the same instruc ons for measuring and cu ng diffuser lens to length as for other top rails shown above Trim 1 1 4 of the tension flanges at the end of the diffuser lens that will be under the top rail RCB Trimming is best done with a small backsaw or sharp u lity knife This will keep the diffuser lens from inte...

Страница 13: ...6 Step 4 Con nued LED Ligh ng Troubleshoo ng Scenario 1 If all loca ons do not illuminate there could be a polarity issue 1 Turn off AC circuit breaker prior to con nuing the next procedure 2 Swap the wires at the driver terminals 3 Replace cover on driver unit 4 Turn on AC circuit breaker 5 Power up the driver and check all LED loca ons for illumina on Scenario 2 Some LED loca ons are illuminated ...

Страница 14: ...s Top Rail Bottom Rail Starter Cable Diffuser Lens Light Strip Bottom Rail Insert LED Connector Pair Female Top Rail Top Rail Insert LED Connector Female Diffuser Lens Starter Cable 20 Starter Cable Light Strip www feeneyinc com 1 800 888 2418 2021 Feeney Inc 09 21 EXPLODED ISOMETRIC VIEWS Star ng Post with Top Rail and Bo om Rail Ligh ng shown with series 150 top rail ...