Step 1B - Drill Posts and Route Starter Cable
Determine the post that will act as the star ng post, this will likely
be designated on the ligh ng layout schema c received with the
order. Installing the starter cable through the post is easiest when
done prior to moun ng the post
.
Determine the loca on that the starter cable will enter the star ng
post.
Note: Depending on the post moun
ࢼ
ng method, and driver loca
ࢼ
on
rela
ࢼ
ve to the post, the starter cable entrance point may vary. (See
Figure 1.2 for typical recommenda
ࢼ
ons)
Figure 1.1
1/2" DIA.
HOLE
GROMMET
PART #1114
For systems with ligh ng installed into Series 200, 300, 350, or
450 top rail:
Fish the connector for the starter cable through the post and out
of the top, and a ach LED Connector (Female) to Starter Cable.
(See Figure 1.3).
IMPORTANT NOTE:
Maintaining the polarity at all connec-
on points is cri cal. Constant alignment veri
fi
ca on
of the of the posi ve and nega ve signs will guarantee
less problems and rework.
Use masking tape to temporarily secure starter cable to outside
of post to prevent retrac ng back into post.
WIRE COMES
UP THROUGH
DECKING AND
INTO POST.
WIRE CAN BE RUN
IN CONDUIT BURIED
IN CONCRETE, OR
RUN DIRECTLY
FROM ENCLOSURE
TO POST. WIRE
INSIDE POST RUNS
BETWEEN INSIDE
POST WALL AND
STANCHION.
WIRE RUNS UNDER
DECK THROUGH
FASCIA BOARDS
AND ENTERS POST
BELOW DECKING
SURFACE BETWEEN
FACSIA AND POST
FACE.
WIRE RUNS
UNDER DECK AND
ENTERS POST
ABOVE FASICA
BRACKET BELOW
DECKING.
WIRE RUNS UNDER
DECK THROUGH 3/4"
HOLE IN BASEPLATE
AND BLOCKING.
(3/4" HOLE DRILLED BY
CUSTOMER)
Figure 1.2
LED CONNECTOR
(FEMALE)
STARTER CABLE
Figure 1.3
MALE CONNECTOR
FEMALE CONNECTOR
Keep the straight line
on the outside ma
ࢼ
ng
connec
ࢼ
on aligned