 -  INSTALLATION INSTRUCTIONS

CAUTION:  BEFORE CONNECTING THE FIXTURE TO A POWER SUPPLY, MAKE SURE THE POWER IS SWITCHED OFF.

DETAILED ILLUSTRATION

THIS DOCUMENT IS PROPRIETARY TO FC LIGHTING, INC. ANY UNAUTHORIZED TRANSFER, USE OR REPRODUCTION IS STRICTLY PROHIBITED. IMPROPER INSTALLATION OR MAINTENANCE OF FIXTURES WILL vOID WARRANTY.

©2018 FC LIGHTING, INC.

GENERAL

:

1.  Before starting the installation, make sure all electricity has been turned 

off and electrical breaker has been locked out and tagged out.

2.  To ensure the success of the installation, be sure to read these 

instructions and review the diagrams thoroughly before beginning.

3.  All electrical connections must be in accordance with local codes, 

ordinances, or the National Electrical Code.

NOTE

: The important safeguards and instructions appearing in this manual 

are not meant to cover all possible conditions and situations that may occur. 

1)      

FOOTING DESIGN: 

All footings should be poured to direct water away from the base 
of the fixture.  Drainage should be provided to prevent water from 
collecting under and around the fixture.  Anchors must be located per 
the dimensions shown (see next page).  Anchor Bolts are galvanized 
steel. The unthreaded portion should be in the concrete and the threaded 
portion should be 7/8” above the concrete.

2)    

INSTALL MOUNTING RING:

 

Remove the top assembly from the bottom mounting plate by loosening 
the (2) screws on top of the housing.  DO NOT remove screws completely.  
Once the footing is set and level, connect 1/2” (O.D.) conduit to the 
bottom of mounting plate and pull wiring into the base housing. Using (4) 
nuts and washers, anchor the mounting plate to the finished concrete. 

TIGHTEN EVENLY AND DO NOT OVERTIGHTEN

.

3)  

WIRING:

 

Make wiring connections.  All wiring connections must be made in 
accordance with local electrical codes, ordinances, and the National 
Electric Code (NEC).

4) 

 Place bollard top assembly over base mounting plate.  Tighten the (2) top 
screws evenly until fixture is held firmly in place. Tighten screws evenly 
to create a proper seal.

5)  Place a bead of silicone caulk around the bottom edge of the bollard 

where the fixture meets the concrete.

IMpORTANT

: All FC

|

SSL products can be cleaned with non-abrasive and chemical 

free agents. Use a soft cloth with mild detergent on exterior only. 















































































































See template on next page for Anchor Bolt locations.

9.4 in

9.6 in

9.4 in

Concrete Minimum Depth

(Bolts are 12” Long)
(Bolt tops should be

7/8” above cement)

Bolts are 7/8”
above cement.

Allow conduit 1”

above cement,

trim as needed to

connect to base.

12” (102 mm)

Concrete Minimum Depth

(Bolts are 12” Long)
(Bolt tops should be

7/8” above cement)

Bolts are 7/8”
above cement.

Allow conduit 1”

above cement,

trim as needed to

connect to base.

12” (102 mm)

Top

Assembly

Bottom
Mounting
Plate