FBR FGP 50/2 EVO-2 Скачать руководство пользователя страница 3

TECHNICAL CHARACTERISTICS

070002_3_B

FGP 50/2 EVO-2

2

TECHNICAL CHARACTERISTICS

TECHNICAL

 

DATA

 FGP 50/2 EVO-2

*

 

Reference

 

conditions:

 

Environment

 

temperature

 

20°C

 

-

 

Barometric

 

pressure

 

1013

 

mbars

 

-

 

Altitude

 

0

 

metre

 

(sea

 

level).

**

 

Measured

 

sonourous

 

pressure

 

in

 

the

 

combustion

 

lab,

 

with

 

funcional

 

burner

 

on

 

beta

 

boiler

 

in

 

a

 

distance

 

of

 

1

 

m

 

(UNI

 

EN

 

ISO

 

3746).

 

***

 

For

 

burner

 

FGP 50/2 EVO-2

 

with

 

long

 

head

 

add

 

1

 

kg

 

to

 

the

 

weight.

OPERATING

 

RANGE

 

DIAGRAM

 

FGP 50/2 EVO-2

The firing rates has been obtained based on test boilers in accordance with EN267 standards and are indicative of matching the burner to the boiler.
For the correct operation of the burner, combustion chamber dimensions must be in accordance with current regulation. In case of non-compliance,
contact the manufacturer.

MODEL

FGP 50/2 EVO-2

Flow min. 1°st. / min. 2°st. - max. 2°st. *

[kg/h]

9.9/20-53.1

Thermal power min. 1°st. / min. 2°st. - max. 2°st. *

[Mcal/h]

100.1/204-541.8

Thermal power min. 1°st. / min. 2°st. - max. 2°st. *

[kW]

117.4/237-630

Fuel: LIGHT-OIL 1.5°E at 20°C = 6.2 cSt = 35 sec Redwood N°1

Intermitted working operation (min. 1 stop every 24 hours) two stages

Environmental conditions operation / storage:

-15...+40°C / -20...+70°C, rel. humidity max. 80%

Max. temperature combustion air

[°C]

60

Nominal electric power

[kW]

1.1

Fan motor

[kW]

0.74

Nominal motor current absorption

[A]

1.8

Nominal auxiliary absorption

[A]

0.3

Power supply:

3~400V, 1N~230V - 50Hz

Electric protection degree:

IP 40

Noisiness ** min-max

[dBA]

71-73

Burner weight ***

[kg]

31

Fig. 1 

X = Thermal power Y = Pression in the combustion chamber

0

2

4

6

8

10

12

0

200

400

500

600

700

[kW]

[mbar]

100

300

Содержание FGP 50/2 EVO-2

Страница 1: ...FGP 50 2 EVO 2 Installation use and maintenance instructions 070002_3_B LIGHT OIL BURNERS AT TWO STAGES...

Страница 2: ..._____ 7 BOILER PLATE ____________________________________________________________________ 7 FLAME TUBE LENGTH _______________________________________________________________ 7 HYDRAULIC SYSTEM HYDRAUL...

Страница 3: ...e in accordance with current regulation In case of non compliance contact the manufacturer MODEL FGP 50 2 EVO 2 Flow min 1 st min 2 st max 2 st kg h 9 9 20 53 1 Thermal power min 1 st min 2 st max 2 s...

Страница 4: ...HARACTERISTICS 070002_3_B FGP 50 2 EVO 2 3 DIMENSIONS MM TC TL Please see chapter Flame tube length Fig 2 Dimensions MODEL A B C D E F O P FGP 50 2 EVO 2 187 314 150 558 417 100 207 200 O P A B C TC T...

Страница 5: ...ATION For the installation of the burner to the generator follow to the diagram shown below Fig 3 Burner installation LEGEND 1 Generator 7 Pipe connection 2 Counterflange 8 Screw 3 Stud bolt 9 Burner...

Страница 6: ...ce handbook supplied with the present instructions After a non alterable lockout the red signal lamp in the lockout reset button pos 2 lights up By pressing the lockout reset button pos 2 for more tha...

Страница 7: ...the integrity of the contents If in dubt do not use the burner and contact the supplier TRANSPORT The transport weights of the burner and the gas train are indicated in the technical data STORAGE Obse...

Страница 8: ...flame tube and front door with refractory material This protection material must not impede flame tube extraction For different flame lengths please contact our Technical Sales Department The burner i...

Страница 9: ...on the return pipe through the pressure regulator pos 3 SAFETY TIME After about 5 10 secs from excitation of the 1st stage valve V1 if the light oil does not ignite the burner stops lock 3RD PHASE 2ND...

Страница 10: ...rms of security especially check Electrical supply The tightness of the plant and its correct realization The presence of water in the plant The ventilation of the boiler location The correct function...

Страница 11: ...analyser NOZZLES G P H PRESSURE FLOW HEAD ADJUSTMENT AIR OPEN 1st STAGE AIR OPEN 2nd STAGE I 60 II 45 bar kg h NOTCH N NOTCH N NOTCH N 2 50 2 50 13 20 1 0 5 2 5 3 00 3 00 12 24 1 1 3 5 3 50 3 50 11 28...

Страница 12: ...t the head group without removing the burner from the boiler a Take off the cover pos 9 by loosening the 3 screws pos 10 b Loosen the connection pos 7 and the screws pos 8 c Take out the head group po...

Страница 13: ...MAINTENANCE 070002_3_B FGP 50 2 EVO 2 13 ELECTRODES POSITIONING Fig 13 Electrode positioning LEGEND 1 Disc Nozzle distance 8 mm 2 Distance between the electrodes 4 mm 3 Disc Electrodes distance 4 mm...

Страница 14: ...the an open contact in the main switch or the meter overload release or no voltage in the line 3 Close the contact of the switches or wait for voltage to be supplied again 4 The thermo stats line was...

Страница 15: ...e them 3 The ignition transformer cables are not well connected 3 Fasten them 4 The ignition transformer is cut off 4 Replace it 5 The electrode faces are not at the right distance 5 Adjust them to th...

Страница 16: ...97000 _ Fax 39 0442 97299 www fbr it _ email fbr fbr it The illustrations and data here shown are indicative F B R Bruciatori S r l reserves the right to bring without any obligation of warning any ch...

Отзывы: