![Fayat BOMAG BW 124 PDH-5 Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/fayat/bomag-bw-124-pdh-5/bomag-bw-124-pdh-5_operating-instruction-maintenance-instruction_546857056.webp)
When checking the tyre pressure stand in the
extended path of the tyre track. Use an at least
6 meter air hose, so that you can keep a safe
distance to the tyre.
Always consider the heavy weight of a wheel
during disassembly and assembly. Use a crane
or forklift truck equipped with suitable claws or
a belt-type hoisting device.
3.11.6 Cleaning work
Do not perform cleaning work while the motor
is running.
Allow the engine to cool down before starting
cleaning work on engine and exhaust system.
Never use gasoline or other easily inflammable
substances for cleaning.
When cleaning with a high pressure cleaner, do
not subject electrical parts and insulation mate-
rial to the direct jet of water, or cover them
beforehand.
Do not guide the water jet into the exhaust pipe
and into the air filter.
3.11.7 After maintenance work
Reassemble all guards and protective devices.
Close all maintenance flaps and maintenance
doors again.
Concerning your safety – Maintenance work
BW 124 PDH-5
56
Содержание BOMAG BW 124 PDH-5
Страница 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Страница 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Страница 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Страница 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Страница 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Страница 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Страница 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Страница 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Страница 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Страница 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Страница 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Страница 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Страница 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Страница 208: ...List of special tools BW 124 PDH 5 208 ...
Страница 209: ......