![Fayat BOMAG BW 124 PDH-5 Скачать руководство пользователя страница 121](http://html1.mh-extra.com/html/fayat/bomag-bw-124-pdh-5/bomag-bw-124-pdh-5_operating-instruction-maintenance-instruction_546857121.webp)
7.2
Loading the machine
Use only stable loading ramps of sufficient load
bearing capacity.
Loading ramps and transport vehicle must be
free of grease, oil, snow and ice.
The ramp inclination must be less than the gra-
deability of the machine.
Make sure that any persons keep a safety dis-
tance of at least 2 metres while the machine is
driven onto or down from the transport vehicle.
The instructing person should not be inside the
travel range of the machine.
Distance from
middle of drum (mm)
Height (mm)
925 ± 100
680 ± 70
DANGER!
Danger to life caused by the
machine slipping or turning over!
– Make sure that no persons are in
the danger zone.
1.
Drive the machine carefully onto the trans-
port vehicle.
2.
Observe the centre of gravity.
3.
Shut down the engine, pull off the ignition
key.
Centre-of-gravity posi-
tion
L
H
B-586-0332
Fig. 102
Loading / transporting the machine – Loading the machine
BW 124 PDH-5
121
Содержание BOMAG BW 124 PDH-5
Страница 9: ...1 Introduction Introduction BW 124 PDH 5 9 ...
Страница 13: ...2 Technical data Technical data BW 124 PDH 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 124 PDH 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 124 PDH 5 19 ...
Страница 69: ...4 Indicators and control elements Indicators and control elements BW 124 PDH 5 69 ...
Страница 81: ...5 Checks prior to start up Checks prior to start up BW 124 PDH 5 81 ...
Страница 86: ...6 Push the dipstick in Checks prior to start up Checking the engine oil level BW 124 PDH 5 86 ...
Страница 92: ...3 Close the cap Checks prior to start up Checking the coolant level BW 124 PDH 5 92 ...
Страница 95: ...6 Operation Operation BW 124 PDH 5 95 ...
Страница 118: ...Operation Emergency procedures BW 124 PDH 5 118 ...
Страница 119: ...7 Loading transporting the machine Loading transporting the machine BW 124 PDH 5 119 ...
Страница 127: ...8 Maintenance Maintenance BW 124 PDH 5 127 ...
Страница 195: ...9 Troubleshooting Troubleshooting BW 124 PDH 5 195 ...
Страница 204: ...Troubleshooting Trouble shooting ECONOMIZER BW 124 PDH 5 204 ...
Страница 205: ...10 Disposal Disposal BW 124 PDH 5 205 ...
Страница 207: ...11 List of special tools List of special tools BW 124 PDH 5 207 ...
Страница 208: ...List of special tools BW 124 PDH 5 208 ...
Страница 209: ......