16.
Dispose of coolant in line with environ-
mental regulations.
8.11.4 Replacing hoses
This work must only be performed by
authorized service personnel.
Perform this maintenance work at
the latest after two years.
The following hoses need to be renewed:
n
fuel hoses,
n
air intake hoses,
n
hoses in connection with the oil separator.
8.11.5 Checking the injection nozzles
This work must only be performed by
authorized service personnel.
Maintenance – Every 2000 operating hours
BW 100 ADM-5
182
Содержание BOMAG BW 100 ADM-5
Страница 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Страница 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Страница 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Страница 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Страница 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Страница 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Страница 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Страница 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Страница 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Страница 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Страница 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Страница 194: ...Maintenance As required BW 100 ADM 5 194 ...
Страница 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Страница 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Страница 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Страница 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Страница 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Страница 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Страница 215: ......
Страница 216: ......